Head Elementary Facility

53 Gwinnett Drive, Bldg E, Lawrenceville, GA 30046


About this Page

On this page you will be able to see results from this facility by tap as available. To help you understand these results, you can watch this video or read "Understanding the Results of Your Water Test" on pages 7-9 of our Full Program Instructions.

The Lead Concentration in Water shows the result from the sample the center collected. ppb means parts per billion, and is a way of explaining the amount of lead in water.

Centers and schools are able to post mitigation actions for each tap here following these instructions.


Taps and Results
  • Bottle Filler
    Location: 1.160 ⋅ 1.174
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    < 0.10 ppbMay 7, 2024
  • 1.102a
    Location: Classroom: 1.102 ⋅ Sink Faucet
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    0.57 ppbFebruary 26, 2024
  • 1.103a
    Location: Classroom: 1.103 ⋅ Sink Faucet
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    0.73 ppbFebruary 26, 2024
  • 1.127a
    Location: Classroom: 1.127 ⋅ Sink Faucet
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    0.78 ppbFebruary 26, 2024
  • 1.129a
    Location: Classroom: 1.129 ⋅ Sink Faucet
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    1.23 ppbFebruary 26, 2024
  • 1.131a
    Location: Classroom: 1.131 ⋅ Sink Faucet
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    0.83 ppbFebruary 26, 2024
  • 1.134a
    Location: Classroom: 1.134 ⋅ Sink Faucet
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    1.62 ppbFebruary 26, 2024
  • 1.136a
    Location: Classroom: 1.136 ⋅ Sink Faucet
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    0.89 ppbFebruary 26, 2024
  • 1.141a
    Location: Classroom: 1.141 ⋅ Sink Faucet
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    1.35 ppbFebruary 26, 2024
  • 1.141b
    Location: Classroom: 1.141 ⋅ Sink Faucet
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    0.34 ppbFebruary 26, 2024
  • 1.149a
    Location: Classroom: 1.149 ⋅ Sink Faucet
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    31.12 ppbFebruary 26, 2024
    Followup Lead Concentration in Water (from RTI International)
    Value Sample Type Analysis Date
    6.87 ppbFirst DrawApril 9, 2024
    1.87 ppb30-second FlushApril 9, 2024
    Remediation Actions - recorded March 12, 2024
    Low-Cost Risk Mitigation Measures
    Replaced faucet fixtures
  • 1.156a
    Location: Classroom: 1.156 ⋅ Sink Faucet
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    4.17 ppbFebruary 26, 2024
  • 1.159a
    Location: Classroom: 1.159 ⋅ Sink Faucet
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    6.98 ppbFebruary 26, 2024
  • 1.159aB
    Location: Classroom: 1.159 ⋅ Sink Bubbler
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    7.88 ppbFebruary 26, 2024
  • 1.164a
    Location: Classroom: 1.164 ⋅ Sink Faucet
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    2.05 ppbFebruary 26, 2024
  • 1.164aB
    Location: Classroom: 1.164 ⋅ Sink Bubbler
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    1.20 ppbFebruary 26, 2024
  • 1.165a
    Location: Classroom: 1.165 ⋅ Sink Faucet
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    46.16 ppbFebruary 26, 2024
    Followup Lead Concentration in Water (from RTI International)
    Value Sample Type Analysis Date
    6.23 ppbFirst DrawApril 9, 2024
    0.30 ppb30-second FlushApril 9, 2024
    Remediation Actions - recorded March 12, 2024
    Low-Cost Risk Mitigation Measures
    Replaced faucet fixtures
  • 1.165aB
    Location: Classroom: 1.165 ⋅ Sink Bubbler
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    3.34 ppbFebruary 26, 2024
  • 1.169a
    Location: Classroom: 1.169 ⋅ Sink Faucet
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    0.84 ppbFebruary 28, 2024
  • 1.169aB
    Location: Classroom: 1.169 ⋅ Sink Bubbler
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    1.55 ppbFebruary 26, 2024
  • 1.170a
    Location: Classroom: 1.170 ⋅ Sink Faucet
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    1.11 ppbFebruary 28, 2024
  • 1.170aB
    Location: Classroom: 1.170 ⋅ Sink Bubbler
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    1.49 ppbFebruary 28, 2024
  • 1.174a
    Location: Classroom: 1.174 ⋅ Sink Faucet
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    0.77 ppbFebruary 28, 2024
  • 1.174aB
    Location: Classroom: 1.174 ⋅ Sink Bubbler
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    1.20 ppbFebruary 28, 2024
  • 1.175a
    Location: Classroom: 1.175 ⋅ Sink Faucet
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    0.87 ppbFebruary 28, 2024
  • 1.176a
    Location: Classroom: 1.176 ⋅ Sink Faucet
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    0.46 ppbFebruary 28, 2024
  • 1.178a
    Location: Classroom: 1.178a ⋅ Sink Faucet / Media Production
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    9,370.34 ppb The reported value is from a dilutionMarch 1, 2024
    Followup Lead Concentration in Water (from RTI International)
    Value Sample Type Analysis Date
    2.46 ppbFirst DrawApril 9, 2024
    < 0.10 ppb30-second FlushApril 9, 2024
    Remediation Actions - recorded March 12, 2024
    Low-Cost Risk Mitigation Measures
    Replaced faucet fixtures
    Additional Risk Mitigation Measures
    Replaced other plumbing components
  • 1.196a
    Location: Classroom: 1.196 ⋅ Sink Faucet
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    1.34 ppbFebruary 28, 2024
  • 1.197a
    Location: Classroom: 1.197 ⋅ Sink Faucet
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    0.98 ppbFebruary 28, 2024
  • 1.201a
    Location: Classroom: 1.201 ⋅ Sink Faucet
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    3.47 ppbFebruary 28, 2024
  • 1.202a
    Location: Classroom: 1.202 ⋅ Sink Faucet
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    0.73 ppbFebruary 28, 2024
  • 3.105a
    Location: Classroom: 3.105 ⋅ Sink Faucet
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    0.16 ppbFebruary 28, 2024
  • 3.105aB
    Location: Classroom: 3.105 ⋅ Sink Bubbler
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    0.92 ppbFebruary 28, 2024
  • 3.107a
    Location: Classroom: 3.107 ⋅ Sink Faucet
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    0.59 ppbMarch 1, 2024
  • 3.108a
    Location: Classroom: 3.108 ⋅ Sink Faucet
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    0.27 ppbFebruary 28, 2024
  • 3.108aB
    Location: Classroom: 3.108 ⋅ Sink Bubbler
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    1.05 ppbFebruary 28, 2024
  • 3.110a
    Location: Classroom: 3.110 ⋅ Sink Faucet
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    2.15 ppbFebruary 28, 2024
  • 3.110aB
    Location: Classroom: 3.110 ⋅ Sink Bubbler
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    3.14 ppbFebruary 28, 2024
  • 3.111a
    Location: Classroom: 3.111 ⋅ Sink Faucet
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    3.08 ppbFebruary 26, 2024
  • 3.112a
    Location: Classroom: 3.112 ⋅ Sink Faucet
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    2.86 ppbFebruary 26, 2024
  • 3.112aB
    Location: Classroom: 3.112 ⋅ Sink Bubbler
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    4.30 ppbFebruary 26, 2024
  • 3.114a
    Location: Classroom: 3.114 ⋅ Sink Faucet
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    0.39 ppbFebruary 26, 2024
  • 3.114aB
    Location: Classroom: 3.114 ⋅ Sink Bubbler
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    0.51 ppbFebruary 26, 2024
  • 3.115a
    Location: Classroom: 3.115 ⋅ Sink Faucet
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    2.21 ppbFebruary 26, 2024
  • 3.115aB
    Location: Classroom: 3.115 ⋅ Sink Bubbler
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    5.96 ppbFebruary 26, 2024
  • 1.205a
    Location: Kitchen/Cafeteria ⋅ 1.205
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    10.03 ppbFebruary 26, 2024
  • 1.205bFL Sink Faucet Right
    Location: Kitchen/Cafeteria ⋅ 1.205
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    7.27 ppbFebruary 26, 2024
  • 1.205bFR Sink Faucet Left
    Location: Kitchen/Cafeteria ⋅ 1.205
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    4.20 ppbFebruary 26, 2024
  • 1.209a at Kitchen Office
    Location: Kitchen/Cafeteria ⋅ 1.209
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    12.74 ppbFebruary 26, 2024
  • 1.205c
    Location: Kitchen/Cafeteria ⋅ 1.205
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    4.38 ppbFebruary 26, 2024
  • 1.205dPF Pot Filler Left
    Location: Kitchen/Cafeteria ⋅ 1.205
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    2.57 ppbFebruary 26, 2024
  • 1.205ePF Pot Filler Right
    Location: Kitchen/Cafeteria ⋅ 1.205
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    507.18 ppb The reported value is from a dilutionFebruary 28, 2024
    Followup Lead Concentration in Water (from RTI International)
    Value Sample Type Analysis Date
    Facility indicated water outlet removed
    Facility indicated water outlet removed
    Remediation Actions - recorded April 30, 2024
    Low-Cost Risk Mitigation Measures
    Removed faucet fixtures
  • 1.151WFa
    Location: Water Fountains ⋅ 1.160
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    < 0.10 ppbFebruary 26, 2024
  • 1.151WFb
    Location: Water Fountains ⋅ 1.160
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    < 0.10 ppbFebruary 26, 2024
  • 3.104WFa
    Location: Water Fountains ⋅ 3.100
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    < 0.10 ppbFebruary 26, 2024
  • 1.102WFa
    Location: Water Fountains ⋅ 1.100
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    < 0.10 ppbFebruary 26, 2024
  • 1.189WFa
    Location: Water Fountains ⋅ 1.185
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    0.53 ppbFebruary 26, 2024
  • 1.189WFb
    Location: Water Fountains ⋅ 1.185
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    0.65 ppbFebruary 26, 2024
  • 1.202WFa
    Location: Water Fountains ⋅ 1.200
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    0.18 ppbFebruary 26, 2024
  • 1.204WFa
    Location: Water Fountains ⋅ 1.204
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    177.22 ppb The reported value is from a dilutionMarch 1, 2024
    Followup Lead Concentration in Water (from RTI International)
    Value Sample Type Analysis Date
    Facility indicated water outlet removed
    Facility indicated water outlet removed
    Remediation Actions - recorded April 30, 2024
    Low-Cost Risk Mitigation Measures
    Removed faucet fixtures
  • 1.204WFa
    Location: Water Fountains ⋅ 1.200
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    0.18 ppbFebruary 26, 2024
  • 1.204GNb
    Location: Water Fountains ⋅ 1.204
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    126.93 ppb The reported value is from a dilutionFebruary 28, 2024
    Followup Lead Concentration in Water (from RTI International)
    Value Sample Type Analysis Date
    3.70 ppbFirst DrawApril 9, 2024
    1.90 ppb30-second FlushApril 9, 2024
    Remediation Actions - recorded April 30, 2024
    Low-Cost Risk Mitigation Measures
    Replaced faucet fixtures
  • 1.204WFbB
    Location: Water Fountains ⋅ 1.204
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    11.42 ppbFebruary 26, 2024