Shiloh High Facility

53 Gwinnett Drive, Bldg E, Lawrenceville, GA 30046


About this Page

On this page you will be able to see results from this facility by tap as available. To help you understand these results, you can watch this video or read "Understanding the Results of Your Water Test" on pages 7-9 of our Full Program Instructions.

The Lead Concentration in Water shows the result from the sample the center collected. ppb means parts per billion, and is a way of explaining the amount of lead in water.

Centers and schools are able to post mitigation actions for each tap here following these instructions.


Taps and Results
  • 1.126a
    Location: Classroom: 1.126 ⋅ Sink Faucet
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    53.30 ppbJuly 19, 2024
    Followup Lead Concentration in Water (from RTI International)
    Value Sample Type Analysis Date
    54.03 ppbFirst DrawAugust 22, 2024
    9.48 ppb30-second FlushAugust 22, 2024
    Remediation Actions - recorded August 5, 2024
    Low-Cost Risk Mitigation Measures
    Replaced faucet fixtures
    Additional Risk Mitigation Measures
    Replaced other plumbing components
  • 1.126b
    Location: Classroom: 1.126 ⋅ Sink Faucet
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    0.48 ppbJuly 19, 2024
  • 1.149a
    Location: Classroom: 1.149 ⋅ Sink Faucet
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    4.70 ppbJuly 19, 2024
  • 1.149b
    Location: Classroom: 1.149 ⋅ Sink Faucet
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    4.58 ppbJuly 18, 2024
  • 1.152a
    Location: Classroom: 1.152 ⋅ Sink Faucet
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    4.68 ppbJuly 19, 2024
  • 1.152b
    Location: Classroom: 1.152 ⋅ Sink Faucet
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    1.16 ppbJuly 18, 2024
  • 1.163a
    Location: Classroom: 1.163 ⋅ Sink Faucet
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    1.09 ppbJuly 19, 2024
  • 1.171a
    Location: Classroom: 1.171 ⋅ Sink Faucet
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    1.00 ppbJuly 24, 2024
  • 1.182a
    Location: Classroom: 1.182 ⋅ Sink Faucet
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    5.61 ppbJuly 19, 2024
  • 1.187a
    Location: Classroom: 1.187 ⋅ Sink Faucet
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    4.82 ppbJuly 19, 2024
  • 1.188a
    Location: Classroom: 1.188 ⋅ Sink Faucet
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    44.63 ppbJuly 24, 2024
    Followup Lead Concentration in Water (from RTI International)
    Value Sample Type Analysis Date
    30.83 ppbFirst DrawAugust 26, 2024
    6.25 ppb30-second FlushAugust 26, 2024
    Remediation Actions - recorded August 5, 2024
    Low-Cost Risk Mitigation Measures
    Replaced faucet fixtures
    Additional Risk Mitigation Measures
    Replaced other plumbing components
  • 1.203a
    Location: Classroom: 1.203 ⋅ Sink Faucet
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    1.48 ppbJuly 18, 2024
  • 1.206a
    Location: Classroom: 1.206 ⋅ Sink Faucet
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    Sample not received, missing or not sampled
  • 1.208a
    Location: Classroom: 1.208 ⋅ Sink Faucet
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    1.00 ppbJuly 18, 2024
  • 1.216a
    Location: Classroom: 1.216 ⋅ Sink Faucet
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    33.32 ppbJuly 19, 2024
    Followup Lead Concentration in Water (from RTI International)
    Value Sample Type Analysis Date
    42.94 ppbFirst DrawAugust 22, 2024
    20.91 ppb30-second FlushAugust 22, 2024
    Remediation Actions - recorded August 5, 2024
    Low-Cost Risk Mitigation Measures
    Replaced faucet fixtures
    Additional Risk Mitigation Measures
    Replaced other plumbing components
  • 1.218a
    Location: Classroom: 1.218 ⋅ Sink Faucet
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    0.82 ppbJuly 18, 2024
  • 1.266a
    Location: Classroom: 1.266 ⋅ Sink Faucet
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    0.37 ppbJuly 18, 2024
  • 1.282a
    Location: Classroom: 1.282 ⋅ Sink Faucet
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    2.20 ppbJuly 19, 2024
  • 1.291a
    Location: Classroom: 1.291 ⋅ Sink Faucet
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    0.37 ppbJuly 17, 2024
  • 1.338a
    Location: Classroom: 1.338 ⋅ Sink Faucet
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    0.53 ppbJuly 17, 2024
  • 1.338b
    Location: Classroom: 1.338 ⋅ Sink Faucet
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    0.85 ppbJuly 17, 2024
  • 1.338c
    Location: Classroom: 1.338 ⋅ Sink Faucet
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    < 0.10 ppbJuly 17, 2024
  • 1.369a
    Location: Classroom: 1.369 ⋅ Sink Faucet
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    21.16 ppbJuly 17, 2024
    Followup Lead Concentration in Water (from RTI International)
    Value Sample Type Analysis Date
    175.15 ppbFirst DrawAugust 22, 2024
    1.23 ppb30-second FlushAugust 22, 2024
    Remediation Actions - recorded August 5, 2024
    Low-Cost Risk Mitigation Measures
    Replaced faucet fixtures
    Additional Risk Mitigation Measures
    Replaced other plumbing components
  • 4.111a
    Location: Classroom: 4.111 ⋅ Sink Faucet
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    0.12 ppbJuly 17, 2024
  • 4.142a
    Location: Classroom: 4.142 ⋅ Sink Faucet
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    0.16 ppbJuly 17, 2024
  • 5.107a
    Location: Classroom: 5.107 ⋅ Sink Faucet
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    0.71 ppbJuly 17, 2024
  • 5.146a
    Location: Classroom: 5.146 ⋅ Sink Faucet
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    6.72 ppbJuly 24, 2024
  • 5.147a
    Location: Classroom: 5.147 ⋅ Sink Faucet
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    0.66 ppbJuly 17, 2024
  • 7.100a
    Location: Classroom: 7.100 ⋅ Sink Faucet
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    0.16 ppbJuly 17, 2024
  • 9.2.106a
    Location: Classroom: 9.2.106 ⋅ Sink Faucet
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    1.41 ppbJuly 17, 2024
  • 9.2.118a
    Location: Classroom: 9.2.118 ⋅ Sink Faucet
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    1.20 ppbJuly 17, 2024
  • 1.239SFa
    Location: Kitchen/Cafeteria ⋅ 1.239
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    0.11 ppbJuly 17, 2024
  • 1.226SFa
    Location: Kitchen/Cafeteria ⋅ 1.226
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    35.76 ppbJuly 17, 2024
    Followup Lead Concentration in Water (from RTI International)
    Value Sample Type Analysis Date
    6,412.22 ppbFirst DrawAugust 26, 2024
    314.89 ppb30-second FlushAugust 22, 2024
    Remediation Actions - recorded August 5, 2024
    Low-Cost Risk Mitigation Measures
    Replaced faucet fixtures
    Additional Risk Mitigation Measures
    Replaced other plumbing components
  • 1.226SFb
    Location: Kitchen/Cafeteria ⋅ 1.226
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    0.52 ppbJuly 18, 2024
  • 1.226PFa
    Location: Kitchen/Cafeteria ⋅ 1.226
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    0.35 ppbJuly 18, 2024
  • 1.226PFb
    Location: Kitchen/Cafeteria ⋅ 1.226
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    < 0.10 ppbJuly 18, 2024
  • 1.227SSa
    Location: Kitchen/Cafeteria ⋅ 1.227
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    3.27 ppbJuly 19, 2024
  • 1.227SSb
    Location: Kitchen/Cafeteria ⋅ 1.227
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    34.65 ppbJuly 19, 2024
    Followup Lead Concentration in Water (from RTI International)
    Value Sample Type Analysis Date
    380.29 ppbFirst DrawAugust 22, 2024
    208.10 ppb30-second FlushAugust 22, 2024
    Remediation Actions - recorded August 5, 2024
    Low-Cost Risk Mitigation Measures
    Replaced faucet fixtures
    Additional Risk Mitigation Measures
    Replaced other plumbing components
  • 1.227SSc
    Location: Kitchen/Cafeteria ⋅ 1.227
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    19.86 ppbJuly 24, 2024
    Followup Lead Concentration in Water (from RTI International)
    Value Sample Type Analysis Date
    0.73 ppbFirst DrawAugust 26, 2024
    0.15 ppb30-second FlushAugust 22, 2024
    Remediation Actions - recorded August 5, 2024
    Low-Cost Risk Mitigation Measures
    Replaced faucet fixtures
    Additional Risk Mitigation Measures
    Replaced other plumbing components
  • 5.238WFa
    Location: Outside ⋅ 5.240
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    < 0.10 ppbJuly 19, 2024
  • 5.238WFb
    Location: Outside ⋅ 5.240
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    < 0.10 ppbJuly 19, 2024
  • 5.238WFc
    Location: Outside ⋅ 5.240
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    < 0.10 ppbJuly 19, 2024
  • 5.231SFa
    Location: Outside ⋅ 5.231
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    0.24 ppbJuly 19, 2024
  • 5.231WFa
    Location: Outside ⋅ 5.231
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    < 0.10 ppbJuly 19, 2024
  • 5.211WFa
    Location: Outside ⋅ 5.211
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    < 0.10 ppbJuly 19, 2024
  • BBWFa
    Location: Outside ⋅ BB
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    2.07 ppbJuly 19, 2024
  • BBWFb
    Location: Outside ⋅ BB
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    0.20 ppbJuly 19, 2024
  • BBSFa
    Location: Outside ⋅ BB
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    1.05 ppbJuly 19, 2024
  • 6.200WFa
    Location: Outside ⋅ 6.200
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    0.50 ppbJuly 19, 2024
  • 6.200WFb
    Location: Outside ⋅ 6.200
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    0.53 ppbJuly 19, 2024
  • 6.208WFa
    Location: Outside ⋅ 6.208
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    13.34 ppbJuly 19, 2024
  • 6.208WFb
    Location: Outside ⋅ 6.208
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    15.84 ppbJuly 19, 2024
    Followup Lead Concentration in Water (from RTI International)
    Value Sample Type Analysis Date
    1.56 ppbFirst DrawAugust 22, 2024
    0.37 ppb30-second FlushAugust 22, 2024
    Remediation Actions - recorded August 5, 2024
    Low-Cost Risk Mitigation Measures
    Replaced water fountains and/or water coolers
    Additional Risk Mitigation Measures
    Replaced other plumbing components
  • 6.108WFa
    Location: Outside ⋅ 6.108
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    7.99 ppbJuly 19, 2024
  • 6.108WFb
    Location: Outside ⋅ 6.108
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    1.61 ppbJuly 19, 2024
  • FBCSFa
    Location: Outside ⋅ FBC
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    1.47 ppbJuly 19, 2024
  • FBCSFa
    Location: Outside ⋅ SBC
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    21.74 ppbJuly 24, 2024
    Followup Lead Concentration in Water (from RTI International)
    Value Sample Type Analysis Date
    1.18 ppbFirst DrawAugust 22, 2024
    0.47 ppb30-second FlushAugust 22, 2024
    Remediation Actions - recorded August 5, 2024
    Low-Cost Risk Mitigation Measures
    Replaced faucet fixtures
    Additional Risk Mitigation Measures
    Replaced other plumbing components
  • 1.121WFa
    Location: Water Fountains ⋅ 1.100
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    0.11 ppbJuly 18, 2024
  • 1.121WFb
    Location: Water Fountains ⋅ 1.100
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    0.38 ppbJuly 18, 2024
  • 3.121WFa
    Location: Water Fountains ⋅ 3.125
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    0.14 ppbJuly 19, 2024
  • 3.121WFb
    Location: Water Fountains ⋅ 3.125
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    < 0.10 ppbJuly 19, 2024
  • 4.103WFa
    Location: Water Fountains ⋅ 4.100
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    < 0.10 ppbJuly 19, 2024
  • 4.103WFb
    Location: Water Fountains ⋅ 4.100
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    0.11 ppbJuly 19, 2024
  • 4.121WFa
    Location: Water Fountains ⋅ 4.100
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    < 0.10 ppbJuly 19, 2024
  • 4.121WFb
    Location: Water Fountains ⋅ 4.100
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    < 0.10 ppbJuly 19, 2024
  • 4.149WFa
    Location: Water Fountains ⋅ 4.130
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    < 0.10 ppbJuly 19, 2024
  • 4.149WFb
    Location: Water Fountains ⋅ 4.130
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    < 0.10 ppbJuly 19, 2024
  • 1.203WFa
    Location: Water Fountains ⋅ 1.200
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    0.10 ppbJuly 19, 2024
  • 1.370WFa
    Location: Water Fountains ⋅ 1.380
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    0.16 ppbJuly 19, 2024
  • 1.309BFa
    Location: Water Fountains ⋅ 1.270
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    < 0.10 ppbJuly 19, 2024
  • 1.309WFb
    Location: Water Fountains ⋅ 1.270
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    0.16 ppbJuly 19, 2024
  • 2.103WFa
    Location: Water Fountains ⋅ 2.110
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    2.08 ppbJuly 19, 2024
  • 2.103WFb
    Location: Water Fountains ⋅ 2.110
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    2.48 ppbJuly 19, 2024
  • 8.119WFa
    Location: Water Fountains ⋅ 8.108
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    < 0.10 ppbJuly 19, 2024
  • 8.119WFb
    Location: Water Fountains ⋅ 8.108
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    0.30 ppbJuly 19, 2024
  • 8.211WFa
    Location: Water Fountains ⋅ 8.202
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    < 0.10 ppbJuly 19, 2024
  • 8.211WFb
    Location: Water Fountains ⋅ 8.202
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    < 0.10 ppbJuly 19, 2024
  • 5.140WFa
    Location: Water Fountains ⋅ 5.140
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    < 0.10 ppbJuly 19, 2024
  • 5.140WFb
    Location: Water Fountains ⋅ 5.140
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    < 0.10 ppbJuly 19, 2024
  • 5.140WFc
    Location: Water Fountains ⋅ 5.140
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    < 0.10 ppbJuly 19, 2024
  • 5.118WFa
    Location: Water Fountains ⋅ 5.118
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    0.31 ppbJuly 19, 2024
  • 5.108WFa
    Location: Water Fountains ⋅ 5.108
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    < 0.10 ppbJuly 19, 2024
  • 7.100WFa
    Location: Water Fountains ⋅ 7.100
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    2.58 ppbJuly 19, 2024
  • 7.100WFb
    Location: Water Fountains ⋅ 7.100
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    0.22 ppbJuly 19, 2024
  • 7.100WFc
    Location: Water Fountains ⋅ 7.100
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    0.26 ppbJuly 19, 2024
  • 7.115WFa
    Location: Water Fountains ⋅ 7.110
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    0.33 ppbJuly 19, 2024
  • 9.2.119WFa
    Location: Water Fountains ⋅ 9.2.110
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    0.12 ppbJuly 19, 2024
  • 9.2.119WFb
    Location: Water Fountains ⋅ 9.2.110
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    < 0.10 ppbJuly 19, 2024
  • 9.2.111WFa
    Location: Water Fountains ⋅ 9.2.111
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    1.69 ppbJuly 19, 2024
  • 9.2.120WFa
    Location: Water Fountains ⋅ 9.2.120
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    0.11 ppbJuly 19, 2024
  • 9.2.120WFb
    Location: Water Fountains ⋅ 9.2.120
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    0.14 ppbJuly 19, 2024
  • 9.2.113WFa
    Location: Water Fountains ⋅ 9.2.113
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    < 0.10 ppbJuly 19, 2024
  • 9.2.113WFb
    Location: Water Fountains ⋅ 9.2.113
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    0.31 ppbJuly 19, 2024