Craig Elementary Facility

53 Gwinnett Drive, Bldg E, Lawrenceville, GA 30046


About this Page

On this page you will be able to see results from this facility by tap as available. To help you understand these results, you can watch this video or read "Understanding the Results of Your Water Test" on pages 7-9 of our Full Program Instructions.

The Lead Concentration in Water shows the result from the sample the center collected. ppb means parts per billion, and is a way of explaining the amount of lead in water.

Centers and schools are able to post mitigation actions for each tap here following these instructions.


Taps and Results
  • 1.179a
    Location: 1.179 ⋅ Gooseneck
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    1.36 ppbApril 30, 2024
  • 1.179b
    Location: 1.179 ⋅ Bubbler
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    2.51 ppbMay 3, 2024
  • 1.184a
    Location: 1.184 ⋅ Gooseneck
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    1.15 ppbMay 3, 2024
  • 1.184b
    Location: 1.184 ⋅ Bubbler
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    Facility indicated water outlet removed
  • 1.194
    Location: 1.194 ⋅ Bubbler
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    11.13 ppbApril 30, 2024
  • 2.225WFbB
    Location: 2.215 ⋅ Water Fountain
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    0.50 ppbMay 3, 2024
  • 2.301a
    Location: 2.301 ⋅ Gooseneck
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    16.56 ppbApril 30, 2024
    Followup Lead Concentration in Water (from RTI International)
    Value Sample Type Analysis Date
    0.57 ppbFirst DrawJuly 27, 2024
    0.17 ppb30-second FlushJuly 27, 2024
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    0.20 ppbSeptember 12, 2024
    Remediation Actions - recorded May 29, 2024
    Low-Cost Risk Mitigation Measures
    Replaced faucet fixtures
    Additional Risk Mitigation Measures
    Replaced other plumbing components
  • 2.302a
    Location: 2.302 ⋅ Gooseneck
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    2.97 ppbMay 2, 2024
  • 2.303a
    Location: 2.303 ⋅ Gooseneck
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    0.97 ppbApril 30, 2024
  • 2.304a
    Location: 2.304 ⋅ Gooseneck
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    0.57 ppbMay 3, 2024
  • 2.311a
    Location: 2.311 ⋅ Gooseneck
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    0.16 ppbMay 3, 2024
  • 1.102aF
    Location: Classroom: 1.102 ⋅ Sink Faucet
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    0.10 ppbMarch 20, 2024
  • 1.117aF
    Location: Classroom: 1.117 ⋅ Sink Faucet
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    0.37 ppbMarch 20, 2024
  • 1.133aGN
    Location: Classroom: 1.133 ⋅ Sink Faucet
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    1.98 ppbMarch 20, 2024
  • 1.134aGN
    Location: Classroom: 1.134 ⋅ Sink Faucet
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    0.59 ppbMarch 20, 2024
  • 1.142aGN
    Location: Classroom: 1.142 ⋅ Sink Faucet
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    0.19 ppbMarch 20, 2024
  • 1.185aB
    Location: Classroom: 1.185 ⋅ Sink Bubbler
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    0.85 ppbMarch 20, 2024
  • 1.185aGN
    Location: Classroom: 1.185 ⋅ Sink Faucet
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    1.16 ppbMarch 20, 2024
  • 1.188aB
    Location: Classroom: 1.188 ⋅ Sink Bubbler
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    4.49 ppbMarch 20, 2024
  • 1.188aGN
    Location: Classroom: 1.188 ⋅ Sink Faucet
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    0.67 ppbMarch 20, 2024
  • 1.194aB
    Location: Classroom: 1.194 ⋅ Sink Bubbler
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    Sample not received, missing or not sampled
    Remediation Actions - recorded October 3, 2024
    Low-Cost Risk Mitigation Measures
    Removed faucet fixtures
  • 1.194aGN
    Location: Classroom: 1.194 ⋅ Sink Faucet
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    0.10 ppbMarch 20, 2024
  • 1.195aB
    Location: Classroom: 1.195 ⋅ Sink Bubbler
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    3.58 ppbMarch 20, 2024
  • 1.195aGN
    Location: Classroom: 1.195 ⋅ Sink Faucet
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    < 0.10 ppbMarch 20, 2024
  • 1.198aB
    Location: Classroom: 1.198 ⋅ Sink Bubbler
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    1.46 ppbMarch 21, 2024
  • 1.198aGN
    Location: Classroom: 1.198 ⋅ Sink Faucet
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    < 0.10 ppbMarch 20, 2024
  • 1.199aB
    Location: Classroom: 1.199 ⋅ Sink Bubbler
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    1.76 ppbMarch 19, 2024
  • 1.199aGN
    Location: Classroom: 1.199 ⋅ Sink Faucet
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    < 0.10 ppbMarch 19, 2024
  • 1.203aB
    Location: Classroom: 1.203 ⋅ Sink Bubbler
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    2.34 ppbMarch 19, 2024
  • 1.203aGN
    Location: Classroom: 1.203 ⋅ Sink Faucet
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    < 0.10 ppbMarch 19, 2024
  • 1.204aB
    Location: Classroom: 1.204 ⋅ Sink Bubbler
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    1.31 ppbMarch 19, 2024
  • 1.204aGN
    Location: Classroom: 1.204 ⋅ Sink Faucet
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    0.12 ppbMarch 19, 2024
  • 1.207aB
    Location: Classroom: 1.207 ⋅ Sink Bubbler
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    0.99 ppbMarch 19, 2024
  • 1.207aGN
    Location: Classroom: 1.207 ⋅ Sink Faucet
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    < 0.10 ppbMarch 19, 2024
  • 1.208aB
    Location: Classroom: 1.208 ⋅ Sink Bubbler
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    10.87 ppbMarch 19, 2024
    Remediation Actions - recorded October 3, 2024
    Low-Cost Risk Mitigation Measures
    Removed faucet fixtures
  • 1.208aGN
    Location: Classroom: 1.208 ⋅ Sink Faucet
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    0.70 ppbMarch 19, 2024
  • 1.223aB
    Location: Classroom: 1.223 ⋅ Sink Bubbler
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    0.27 ppbMarch 19, 2024
  • 1.223aGN
    Location: Classroom: 1.223 ⋅ Sink Faucet
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    0.62 ppbMarch 19, 2024
  • 1.224aB
    Location: Classroom: 1.224 ⋅ Sink Bubbler
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    0.33 ppbMarch 19, 2024
  • 1.224aGN
    Location: Classroom: 1.224 ⋅ Sink Faucet
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    1.09 ppbMarch 19, 2024
  • 1.225aB
    Location: Classroom: 1.225 ⋅ Sink Bubbler
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    0.58 ppbMarch 19, 2024
  • 1.225aGN
    Location: Classroom: 1.225 ⋅ Sink Faucet
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    1.29 ppbMarch 19, 2024
  • 1.226aB
    Location: Classroom: 1.226 ⋅ Sink Bubbler
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    3.30 ppbMarch 19, 2024
  • 1.226aGN
    Location: Classroom: 1.226 ⋅ Sink Faucet
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    4.11 ppbMarch 20, 2024
  • 1.227aB
    Location: Classroom: 1.227 ⋅ Sink Bubbler
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    1.89 ppbMarch 19, 2024
  • 1.227aGN
    Location: Classroom: 1.227 ⋅ Sink Faucet
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    1.03 ppbMarch 19, 2024
  • 1.228aB
    Location: Classroom: 1.228 ⋅ Sink Bubbler
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    0.45 ppbMarch 19, 2024
  • 1.228aGN
    Location: Classroom: 1.228 ⋅ Sink Faucet
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    0.41 ppbMarch 19, 2024
  • 1.229aB
    Location: Classroom: 1.229 ⋅ Sink Bubbler
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    0.45 ppbMarch 19, 2024
  • 1.229aGN
    Location: Classroom: 1.229 ⋅ Sink Faucet
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    0.58 ppbMarch 19, 2024
  • 1.230aB
    Location: Classroom: 1.230 ⋅ Sink Bubbler
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    0.69 ppbMarch 19, 2024
  • 1.230aGN
    Location: Classroom: 1.230 ⋅ Sink Faucet
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    < 0.10 ppbMarch 19, 2024
  • 1.231aB
    Location: Classroom: 1.231 ⋅ Sink Bubbler
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    0.65 ppbMarch 19, 2024
  • 1.231aGN
    Location: Classroom: 1.231 ⋅ Sink Faucet
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    0.46 ppbMarch 19, 2024
  • 1.232aB
    Location: Classroom: 1.232 ⋅ Sink Bubbler
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    1.29 ppbMarch 19, 2024
  • 1.232aGN
    Location: Classroom: 1.232 ⋅ Sink Faucet
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    0.45 ppbMarch 19, 2024
  • 1.238aGN
    Location: Classroom: 1.238 ⋅ Sink Faucet
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    0.41 ppbMarch 19, 2024
  • 1.238bGN
    Location: Classroom: 1.238 ⋅ Sink Faucet
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    0.38 ppbMarch 19, 2024
  • 1.240aGN
    Location: Classroom: 1.240 ⋅ Sink Faucet
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    1.39 ppbMarch 19, 2024
  • 1.240bGN
    Location: Classroom: 1.240 ⋅ Sink Faucet
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    2.09 ppbMarch 19, 2024
  • 2.101aGN
    Location: Classroom: 2.101 ⋅ Sink Faucet
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    0.19 ppbMarch 19, 2024
  • 2.107aGN
    Location: Classroom: 2.107 ⋅ Sink Faucet
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    0.17 ppbMarch 19, 2024
  • 2.109aGN
    Location: Classroom: 2.109 ⋅ Sink Faucet
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    < 0.10 ppbMarch 19, 2024
  • 2.111aGN
    Location: Classroom: 2.111 ⋅ Sink Faucet
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    1.94 ppbMarch 19, 2024
  • 2.113aGN
    Location: Classroom: 2.113 ⋅ Sink Faucet
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    0.11 ppbMarch 19, 2024
  • 2.114aGN
    Location: Classroom: 2.114 ⋅ Sink Faucet
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    Sample not received, missing or not sampled
  • 2.120aGN
    Location: Classroom: 2.120 ⋅ Sink Faucet
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    0.22 ppbMarch 19, 2024
  • 2.129aGN
    Location: Classroom: 2.129 ⋅ Sink Faucet
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    0.11 ppbMarch 19, 2024
  • 2.136aGN
    Location: Classroom: 2.136 ⋅ Sink Faucet
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    < 0.10 ppbMarch 19, 2024
  • 2.138aGN
    Location: Classroom: 2.138 ⋅ Sink Faucet
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    0.25 ppbMarch 19, 2024
  • 2.148aGN
    Location: Classroom: 2.148 ⋅ Sink Faucet
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    0.39 ppbMarch 19, 2024
  • 2.201aGN
    Location: Classroom: 2.201 ⋅ Sink Faucet
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    0.16 ppbMarch 19, 2024
  • 2.202aGN
    Location: Classroom: 2.202 ⋅ Sink Faucet
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    0.40 ppbMarch 19, 2024
  • 2.203aGN
    Location: Classroom: 2.203 ⋅ Sink Faucet
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    0.50 ppbMarch 19, 2024
  • 2.211aGN
    Location: Classroom: 2.211 ⋅ Sink Faucet
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    0.41 ppbMarch 19, 2024
  • 2.213aGN
    Location: Classroom: 2.213 ⋅ Sink Faucet
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    0.48 ppbMarch 19, 2024
  • 2.214aGN
    Location: Classroom: 2.214 ⋅ Sink Faucet
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    0.89 ppbMarch 19, 2024
  • 2.216aGN
    Location: Classroom: 2.216 ⋅ Sink Faucet
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    0.55 ppbMarch 19, 2024
  • 2.217aGN
    Location: Classroom: 2.217 ⋅ Sink Faucet
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    0.15 ppbMarch 19, 2024
  • 2.218aGN
    Location: Classroom: 2.218 ⋅ Sink Faucet
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    0.10 ppbMarch 20, 2024
  • 2.219aGN
    Location: Classroom: 2.219 ⋅ Sink Faucet
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    0.10 ppbMarch 20, 2024
  • 2.221aGN
    Location: Classroom: 2.221 ⋅ Sink Faucet
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    < 0.10 ppbMarch 20, 2024
  • 2.313GN
    Location: Classroom: 2.313 ⋅ Sink Faucet
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    0.14 ppbMarch 19, 2024
  • 2.314GN
    Location: Classroom: 2.314 ⋅ Sink Faucet
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    0.35 ppbMarch 20, 2024
  • 2.316GN
    Location: Classroom: 2.316 ⋅ Sink Faucet
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    0.17 ppbMarch 20, 2024
  • 2.317GN
    Location: Classroom: 2.317 ⋅ Sink Faucet
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    0.29 ppbMarch 20, 2024
  • 2.318
    Location: Classroom: 2.318 ⋅ Sink Faucet
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    0.18 ppbMarch 20, 2024
  • 2.319
    Location: Classroom: 2.319 ⋅ Sink Faucet
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    0.38 ppbMarch 20, 2024
  • 2.321
    Location: Classroom: 2.321 ⋅ Sink Faucet
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    1.97 ppbMarch 20, 2024
  • 1.148KSaF
    Location: Kitchen/Cafeteria ⋅ 1.148
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    0.37 ppbMarch 19, 2024
  • 1.148PFa(vcm)
    Location: Kitchen/Cafeteria ⋅ 1.148
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    6.50 ppbMarch 19, 2024
  • 1.148PFb(vcm)
    Location: Kitchen/Cafeteria ⋅ 1.148
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    41.17 ppbMarch 19, 2024
    Followup Lead Concentration in Water (from RTI International)
    Value Sample Type Analysis Date
    0.69 ppbFirst DrawApril 27, 2024
    0.14 ppb30-second FlushApril 27, 2024
    Remediation Actions - recorded April 9, 2024
    Low-Cost Risk Mitigation Measures
    Replaced faucet fixtures
  • 1.148PFc
    Location: Kitchen/Cafeteria ⋅ 1.148
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    2.77 ppbMarch 20, 2024
  • 1.148PFd
    Location: Kitchen/Cafeteria ⋅ 1.148
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    0.56 ppbMarch 20, 2024
  • 1.174WFaB
    Location: Water Fountains ⋅ 1.170
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    < 0.10 ppbMarch 19, 2024
  • 1.174WFbB
    Location: Water Fountains ⋅ 1.170
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    < 0.10 ppbMarch 19, 2024
  • 1.126WFaB
    Location: Water Fountains ⋅ 1.120
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    < 0.10 ppbMarch 19, 2024
  • 1.126WFbB
    Location: Water Fountains ⋅ 1.120
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    < 0.10 ppbMarch 19, 2024
  • 1.117WFaB
    Location: Water Fountains ⋅ 1.115
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    < 0.10 ppbMarch 19, 2024
  • 1.217WFaB
    Location: Water Fountains ⋅ 1.210
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    < 0.10 ppbMarch 19, 2024
  • 1.217WFbB
    Location: Water Fountains ⋅ 1.210
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    < 0.10 ppbMarch 19, 2024
  • 2.225WFaB
    Location: Water Fountains ⋅ 2.215
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    0.20 ppbMarch 20, 2024
  • 2.225WFcB
    Location: Water Fountains ⋅ 2.215
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    < 0.10 ppbMarch 19, 2024
  • 2.325WFaB
    Location: Water Fountains ⋅ 2.315
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    < 0.10 ppbMarch 20, 2024
  • 2.325WFbB
    Location: Water Fountains ⋅ 2.315
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    < 0.10 ppbMarch 20, 2024
  • 2.325WFcB
    Location: Water Fountains ⋅ 2.315
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    < 0.10 ppbMarch 20, 2024
  • 1.147WFaB
    Location: Water Fountains ⋅ Cafe
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    < 0.10 ppbMarch 20, 2024
  • 1.147BFa
    Location: Water Fountains ⋅ Cafe
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    < 0.10 ppbMarch 20, 2024