Snellville Middle Facility

53 Gwinnett Drive, Bldg E, Lawrenceville, GA 30046


About this Page

On this page you will be able to see results from this facility by tap as available. To help you understand these results, you can watch this video or read "Understanding the Results of Your Water Test" on pages 7-9 of our Full Program Instructions.

The Lead Concentration in Water shows the result from the sample the center collected. ppb means parts per billion, and is a way of explaining the amount of lead in water.

Centers and schools are able to post mitigation actions for each tap here following these instructions.


Taps and Results
  • 1.13a
    Location: Classroom: 1.13 ⋅ Sink Faucet
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    0.16 ppbJune 6, 2024
  • 1.211a
    Location: Classroom: 1.211 ⋅ Sink Faucet
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    2.42 ppbJune 6, 2024
  • 1.22a
    Location: Classroom: 1.22 ⋅ Sink Faucet
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    0.65 ppbJune 6, 2024
  • 1.230a
    Location: Classroom: 1.230 ⋅ Sink Faucet
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    2.41 ppbJune 6, 2024
  • 1.230b
    Location: Classroom: 1.230 ⋅ Sink Faucet
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    1.37 ppbJune 6, 2024
  • 1.230c
    Location: Classroom: 1.230 ⋅ Sink Faucet
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    0.19 ppbJune 6, 2024
  • 1.37a
    Location: Classroom: 1.37 ⋅ Sink Faucet
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    44.61 ppbJune 6, 2024
    Followup Lead Concentration in Water (from RTI International)
    Value Sample Type Analysis Date
    8.02 ppbFirst DrawAugust 20, 2024
    < 0.10 ppb30-second FlushAugust 20, 2024
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    3.92 ppbNovember 26, 2024
    Remediation Actions - recorded July 15, 2024
    Low-Cost Risk Mitigation Measures
    Replaced faucet fixtures
    Additional Risk Mitigation Measures
    Replaced other plumbing components
  • 1.37b
    Location: Classroom: 1.37 ⋅ Sink Faucet
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    0.70 ppbJune 6, 2024
  • 1.37c
    Location: Classroom: 1.37 ⋅ Sink Faucet
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    667.44 ppb The reported value is from a dilutionJune 7, 2024
    Followup Lead Concentration in Water (from RTI International)
    Value Sample Type Analysis Date
    0.37 ppbFirst DrawAugust 20, 2024
    0.18 ppb30-second FlushAugust 20, 2024
    Remediation Actions - recorded July 15, 2024
    Low-Cost Risk Mitigation Measures
    Replaced faucet fixtures
    Additional Risk Mitigation Measures
    Replaced other plumbing components
  • 1.37d
    Location: Classroom: 1.37 ⋅ Sink Faucet
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    32.19 ppbJune 6, 2024
    Followup Lead Concentration in Water (from RTI International)
    Value Sample Type Analysis Date
    0.51 ppbFirst DrawAugust 20, 2024
    < 0.10 ppb30-second FlushAugust 20, 2024
    Remediation Actions - recorded July 15, 2024
    Low-Cost Risk Mitigation Measures
    Replaced faucet fixtures
    Additional Risk Mitigation Measures
    Replaced other plumbing components
  • 1.44a
    Location: Classroom: 1.44 ⋅ Sink Faucet
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    4.32 ppbJune 6, 2024
  • 1.44b
    Location: Classroom: 1.44 ⋅ Sink Faucet
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    13.74 ppbJune 6, 2024
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    41.21 ppbNovember 26, 2024
    Followup Lead Concentration in Water (from RTI International)
    Value Sample Type Analysis Date
    0.20 ppbFirst DrawJanuary 3, 2025
    0.11 ppb30-second FlushJanuary 3, 2025
    Remediation Actions - recorded December 20, 2024
    Low-Cost Risk Mitigation Measures
    Replaced faucet fixtures
    Additional Risk Mitigation Measures
    Replaced other plumbing components
  • 1.46a
    Location: Classroom: 1.46 ⋅ Sink Faucet
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    181.55 ppb The reported value is from a dilutionJune 7, 2024
    Followup Lead Concentration in Water (from RTI International)
    Value Sample Type Analysis Date
    0.17 ppbFirst DrawAugust 20, 2024
    0.12 ppb30-second FlushAugust 20, 2024
    Remediation Actions - recorded July 15, 2024
    Low-Cost Risk Mitigation Measures
    Replaced faucet fixtures
    Additional Risk Mitigation Measures
    Replaced other plumbing components
  • 1.46b
    Location: Classroom: 1.46 ⋅ Sink Faucet
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    7.47 ppbJune 6, 2024
  • 1.67a
    Location: Classroom: 1.67 ⋅ Sink Faucet
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    0.39 ppbJune 6, 2024
  • 3.132a
    Location: Classroom: 3.132 ⋅ Sink Faucet
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    0.36 ppbJune 6, 2024
  • 3.133a
    Location: Classroom: 3.132 ⋅ Sink Faucet
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    0.31 ppbJune 6, 2024
  • 4.109a
    Location: Classroom: 4.109 ⋅ Sink Faucet
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    411.01 ppb The reported value is from a dilutionJune 11, 2024
    Followup Lead Concentration in Water (from RTI International)
    Value Sample Type Analysis Date
    3.53 ppbFirst DrawAugust 20, 2024
    0.17 ppb30-second FlushAugust 20, 2024
    Remediation Actions - recorded July 15, 2024
    Low-Cost Risk Mitigation Measures
    Replaced faucet fixtures
    Additional Risk Mitigation Measures
    Replaced other plumbing components
  • 4.109b
    Location: Classroom: 4.109 ⋅ Sink Faucet
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    644.69 ppb The reported value is from a dilutionJune 11, 2024
    Followup Lead Concentration in Water (from RTI International)
    Value Sample Type Analysis Date
    2.49 ppbFirst DrawAugust 20, 2024
    0.67 ppb30-second FlushAugust 20, 2024
    Remediation Actions - recorded July 15, 2024
    Low-Cost Risk Mitigation Measures
    Replaced faucet fixtures
    Additional Risk Mitigation Measures
    Replaced other plumbing components
  • 5.301a
    Location: Gym ⋅ 5.301
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    < 0.10 ppbJune 7, 2024
  • 5.301b
    Location: Gym ⋅ 5.301
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    0.11 ppbJune 7, 2024
  • 2.107a
    Location: Gym ⋅ 2.107
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    0.29 ppbJune 7, 2024
  • 2.110a
    Location: Gym ⋅ 2.110
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    0.64 ppbJune 7, 2024
  • 1.205a
    Location: Kitchen/Cafeteria ⋅ 1.205
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    0.17 ppbJune 7, 2024
  • 1.205b
    Location: Kitchen/Cafeteria ⋅ 1.205
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    0.28 ppbJune 7, 2024
  • 1.205c
    Location: Kitchen/Cafeteria ⋅ 1.205
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    0.36 ppbJune 7, 2024
  • 1.67WFa
    Location: Water Fountains ⋅ 1.05
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    0.26 ppbJune 6, 2024
  • 1.88WFa
    Location: Water Fountains ⋅ 1.89
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    0.22 ppbJune 6, 2024
  • 1.84WFa
    Location: Water Fountains ⋅ 1.96
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    0.26 ppbJune 6, 2024
  • 1.84WFb
    Location: Water Fountains ⋅ 1.96
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    < 0.10 ppbJune 6, 2024
  • 1.80WFa
    Location: Water Fountains ⋅ 1.76
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    < 0.10 ppbJune 6, 2024
  • 1.21WFa
    Location: Water Fountains ⋅ 1.20
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    < 0.10 ppbJune 6, 2024
  • 1.41WFa
    Location: Water Fountains ⋅ 1.31
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    < 0.10 ppbJune 6, 2024
  • 1.41WFb
    Location: Water Fountains ⋅ 1.31
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    < 0.10 ppbJune 7, 2024
  • 1.55WFa
    Location: Water Fountains ⋅ 1.54
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    1.14 ppbJune 6, 2024
  • 5.110WFa
    Location: Water Fountains ⋅ 5.103
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    0.11 ppbJune 6, 2024
  • 5.110WFb
    Location: Water Fountains ⋅ 5.103
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    1.09 ppbJune 6, 2024
  • 5.129WFa
    Location: Water Fountains ⋅ 5.111A
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    < 0.10 ppbJune 7, 2024
  • 5.129WFb
    Location: Water Fountains ⋅ 5.111A
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    < 0.10 ppbJune 7, 2024
  • 5.210WFa
    Location: Water Fountains ⋅ 5.203
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    0.15 ppbJune 7, 2024
  • 5.210WFb
    Location: Water Fountains ⋅ 5.203
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    < 0.10 ppbJune 7, 2024
  • 5.214WFa
    Location: Water Fountains ⋅ 5.212
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    < 0.10 ppbJune 7, 2024
  • 5.214WFb
    Location: Water Fountains ⋅ 5.212
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    0.12 ppbJune 7, 2024
  • 3.134WFa
    Location: Water Fountains ⋅ 3.139
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    < 0.10 ppbJune 7, 2024
  • 3.134WFb
    Location: Water Fountains ⋅ 3.139
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    1.38 ppbJune 7, 2024
  • 4.132WFa
    Location: Water Fountains ⋅ 4.100
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    0.11 ppbJune 6, 2024
  • 1.218BFa
    Location: Water Fountains ⋅ 1.201
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    < 0.10 ppbJune 7, 2024
  • 1.211WFa
    Location: Water Fountains ⋅ 1.211
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    2.23 ppbJune 7, 2024