Bay Creek Middle Facility

53 Gwinnett Drive, Bldg E, Lawrenceville, GA 30046


About this Page

On this page you will be able to see results from this facility by tap as available. To help you understand these results, you can watch this video or read "Understanding the Results of Your Water Test" on pages 7-9 of our Full Program Instructions.

The Lead Concentration in Water shows the result from the sample the center collected. ppb means parts per billion, and is a way of explaining the amount of lead in water.

Centers and schools are able to post mitigation actions for each tap here following these instructions.


Taps and Results
  • 1.068SFa
    Location: Classroom: 1.068 ⋅ Sink Faucet
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    5.02 ppbJune 29, 2024
  • 1.070SFa
    Location: Classroom: 1.070 ⋅ Sink Faucet
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    2.76 ppbJune 29, 2024
  • 1.070SSaB
    Location: Classroom: 1.070 ⋅ Sink Faucet
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    5.06 ppbJune 29, 2024
  • 1.070SFb
    Location: Classroom: 1.070 ⋅ Sink Faucet
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    15.55 ppbJune 29, 2024
    Followup Lead Concentration in Water (from RTI International)
    Value Sample Type Analysis Date
    4.42 ppbFirst DrawAugust 12, 2024
    < 0.10 ppb30-second FlushAugust 22, 2024
    Remediation Actions - recorded July 30, 2024
    Low-Cost Risk Mitigation Measures
    Replaced faucet fixtures
    Additional Risk Mitigation Measures
    Replaced other plumbing components
  • 1.070SSbB
    Location: Classroom: 1.070 ⋅ Sink Faucet
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    50.44 ppbJuly 16, 2024
    Followup Lead Concentration in Water (from RTI International)
    Value Sample Type Analysis Date
    0.70 ppbFirst DrawAugust 22, 2024
    0.11 ppb30-second FlushAugust 22, 2024
    Remediation Actions - recorded July 30, 2024
    Low-Cost Risk Mitigation Measures
    Replaced faucet fixtures
    Additional Risk Mitigation Measures
    Replaced other plumbing components
  • 1.070SFc
    Location: Classroom: 1.070 ⋅ Sink Faucet
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    12.02 ppbJune 29, 2024
  • 1.070SScB
    Location: Classroom: 1.070 ⋅ Sink Faucet
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    27.48 ppbJuly 16, 2024
    Followup Lead Concentration in Water (from RTI International)
    Value Sample Type Analysis Date
    6.25 ppbFirst DrawAugust 22, 2024
    < 0.10 ppb30-second FlushAugust 22, 2024
    Remediation Actions - recorded July 30, 2024
    Low-Cost Risk Mitigation Measures
    Replaced faucet fixtures
    Additional Risk Mitigation Measures
    Replaced other plumbing components
  • 1.082SFa
    Location: Classroom: 1.082 ⋅ Sink Faucet
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    0.38 ppbJune 29, 2024
  • 1.217SFa
    Location: Classroom: 1.217 ⋅ Sink Faucet
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    0.96 ppbJune 29, 2024
  • 1.228SFa
    Location: Classroom: 1.228 ⋅ Sink Faucet
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    1.35 ppbJune 29, 2024
  • 1.232SFa
    Location: Classroom: 1.232 ⋅ Sink Faucet
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    1.36 ppbJune 29, 2024
  • 1.247SFa
    Location: Classroom: 1.247 ⋅ Sink Faucet
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    0.89 ppbJune 29, 2024
  • 1.283SFa
    Location: Classroom: 1.283 ⋅ Sink Faucet
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    1.58 ppbJune 29, 2024
  • 1.308SFa
    Location: Classroom: 1.308 ⋅ Sink Faucet
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    1.27 ppbJune 29, 2024
  • 1.318SFc
    Location: Classroom: 1.318 ⋅ Sink Faucet
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    3.07 ppbJune 29, 2024
  • 1.323SFa
    Location: Classroom: 1.323 ⋅ Sink Faucet
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    2.52 ppbJune 29, 2024
  • 1.346SFa
    Location: Classroom: 1.346 ⋅ Sink Faucet
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    0.66 ppbJune 29, 2024
  • 1.032WFa
    Location: Gym ⋅ 1.032
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    < 0.10 ppbJune 29, 2024
  • 1.032WFb
    Location: Gym ⋅ 1.032
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    < 0.10 ppbJune 30, 2024
  • 1.022PFa
    Location: Kitchen/Cafeteria ⋅ 1.022
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    9.44 ppbJune 30, 2024
  • 1.022PFb
    Location: Kitchen/Cafeteria ⋅ 1.022
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    1.92 ppbJune 29, 2024
  • 1.022SFa
    Location: Kitchen/Cafeteria ⋅ 1.022
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    0.57 ppbJune 30, 2024
  • 1.022SSaB
    Location: Kitchen/Cafeteria ⋅ 1.022
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    0.54 ppbJune 30, 2024
  • 1.022SFb
    Location: Kitchen/Cafeteria ⋅ 1.022
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    0.56 ppbJune 30, 2024
  • 1.022SSbB
    Location: Kitchen/Cafeteria ⋅ 1.022
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    0.42 ppbJune 29, 2024
  • 1.022PFc
    Location: Kitchen/Cafeteria ⋅ 1.022
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    9.89 ppbJune 30, 2024
  • 1.244WFa
    Location: Water Fountains ⋅ 1.240
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    < 0.10 ppbJune 29, 2024
  • 1.244BFb
    Location: Water Fountains ⋅ 1.240
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    < 0.10 ppbJune 29, 2024
  • 1.276WFa
    Location: Water Fountains ⋅ 1.270
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    < 0.10 ppbJune 29, 2024
  • 1.276BFb
    Location: Water Fountains ⋅ 1.270
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    < 0.10 ppbJune 29, 2024
  • 1.276WFb
    Location: Water Fountains ⋅ 1.270
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    < 0.10 ppbJune 29, 2024
  • 1.276WFc
    Location: Water Fountains ⋅ 1.270
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    < 0.10 ppbJune 29, 2024
  • 1.338WFa
    Location: Water Fountains ⋅ 1.335
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    < 0.10 ppbJune 29, 2024
  • 1.338BFb
    Location: Water Fountains ⋅ 1.335
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    < 0.10 ppbJune 29, 2024
  • 1.338WFb
    Location: Water Fountains ⋅ 1.335
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    < 0.10 ppbJune 29, 2024
  • 1.338WFc
    Location: Water Fountains ⋅ 1.335
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    < 0.10 ppbJune 29, 2024
  • 1.305WFa
    Location: Water Fountains ⋅ 1.300
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    0.25 ppbJune 29, 2024
  • 1.305WFb
    Location: Water Fountains ⋅ 1.300
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    < 0.10 ppbJune 29, 2024
  • 1.099BFa
    Location: Water Fountains ⋅ 1.085
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    < 0.10 ppbJune 29, 2024
  • 1.099WFa
    Location: Water Fountains ⋅ 1.085
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    < 0.10 ppbJune 29, 2024
  • 1.099WFb
    Location: Water Fountains ⋅ 1.085
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    < 0.10 ppbJune 30, 2024
  • 1.019WFa
    Location: Water Fountains ⋅ 1.010
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    0.17 ppbJune 29, 2024
  • 1.019BFb
    Location: Water Fountains ⋅ 1.010
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    < 0.10 ppbJune 29, 2024
  • 1.019WFb
    Location: Water Fountains ⋅ 1.010
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    < 0.10 ppbJuly 4, 2024
  • 1.057BFa
    Location: Water Fountains ⋅ 1.060
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    0.87 ppbJune 29, 2024
  • 1.057WFb
    Location: Water Fountains ⋅ 1.060
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    0.56 ppbJune 29, 2024
  • 1.020WFa
    Location: Water Fountains ⋅ 1.020
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    0.19 ppbJune 29, 2024
  • 1.020BFbA
    Location: Water Fountains ⋅ 1.020
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    0.11 ppbJune 29, 2024
  • 1.020WFbB
    Location: Water Fountains ⋅ 1.020
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    0.17 ppbJune 29, 2024
  • 1.057WFa
    Location: Water Fountains ⋅ 1.060
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    0.48 ppbJune 29, 2024