1.101a
Location: Classroom: 1.101 ⋅ Sink Faucet
Lead Concentration in Water (from RTI International)
Value |
Analysis Date |
0.68 ppb | March 7, 2024 |
-
1.101aB
Location: Classroom: 1.101 ⋅ Sink Bubbler
Lead Concentration in Water (from RTI International)
Value |
Analysis Date |
11.27 ppb | March 7, 2024 |
Remediation Actions - recorded October 3, 2024
Low-Cost Risk Mitigation Measures
Removed faucet fixtures
-
1.104a
Location: Classroom: 1.104 ⋅ Sink Faucet
Lead Concentration in Water (from RTI International)
Value |
Analysis Date |
23.39 ppb | March 7, 2024 |
Followup Lead Concentration in Water (from RTI International)
Value |
Sample Type |
Analysis Date |
21.14 ppb | First Draw | April 19, 2024 |
0.25 ppb | 30-second Flush | April 17, 2024 |
Lead Concentration in Water (from RTI International)
Value |
Analysis Date |
8.53 ppb | August 11, 2024 |
Lead Concentration in Water (from RTI International)
Value |
Analysis Date |
0.27 ppb | November 14, 2024 |
Remediation Actions - recorded May 13, 2024
Low-Cost Risk Mitigation Measures
Replaced faucet fixtures
Additional Risk Mitigation Measures
Replaced other plumbing components
-
1.104aB
Location: Classroom: 1.104 ⋅ Sink Bubbler
Lead Concentration in Water (from RTI International)
Value |
Analysis Date |
0.70 ppb | March 7, 2024 |
-
1.107a
Location: Classroom: 1.107 ⋅ Sink Faucet
Lead Concentration in Water (from RTI International)
Value |
Analysis Date |
0.17 ppb | March 7, 2024 |
-
1.110a
Location: Classroom: 1.110 ⋅ Sink Faucet
Lead Concentration in Water (from RTI International)
Value |
Analysis Date |
< 0.10 ppb | March 7, 2024 |
-
1.111a
Location: Classroom: 1.111 ⋅ Sink Faucet
Lead Concentration in Water (from RTI International)
Value |
Analysis Date |
0.35 ppb | March 7, 2024 |
-
1.115a
Location: Classroom: 1.115 ⋅ Sink Faucet
Lead Concentration in Water (from RTI International)
Value |
Analysis Date |
0.66 ppb | March 7, 2024 |
-
1.115aB
Location: Classroom: 1.115 ⋅ Sink Bubbler
Lead Concentration in Water (from RTI International)
Value |
Analysis Date |
1.02 ppb | March 7, 2024 |
-
1.116a
Location: Classroom: 1.116 ⋅ Sink Faucet
Lead Concentration in Water (from RTI International)
Value |
Analysis Date |
0.68 ppb | March 7, 2024 |
-
1.116aB
Location: Classroom: 1.116 ⋅ Sink Bubbler
Lead Concentration in Water (from RTI International)
Value |
Analysis Date |
0.73 ppb | March 7, 2024 |
-
1.117a
Location: Classroom: 1.117 ⋅ Sink Faucet
Lead Concentration in Water (from RTI International)
Value |
Analysis Date |
0.13 ppb | March 7, 2024 |
-
1.117aB
Location: Classroom: 1.117 ⋅ Sink Bubbler
Lead Concentration in Water (from RTI International)
Value |
Analysis Date |
0.15 ppb | March 7, 2024 |
-
1.120a
Location: Classroom: 1.120 ⋅ Sink Faucet
Lead Concentration in Water (from RTI International)
Value |
Analysis Date |
0.30 ppb | March 7, 2024 |
-
1.120aB
Location: Classroom: 1.120 ⋅ Sink Bubbler
Lead Concentration in Water (from RTI International)
Value |
Analysis Date |
0.27 ppb | March 7, 2024 |
-
1.125a
Location: Classroom: 1.125 ⋅ Sink Faucet
Lead Concentration in Water (from RTI International)
Value |
Analysis Date |
5.06 ppb | March 7, 2024 |
-
1.130a
Location: Classroom: 1.130 ⋅ Sink Faucet
Lead Concentration in Water (from RTI International)
Value |
Analysis Date |
0.17 ppb | March 7, 2024 |
-
1.134a
Location: Classroom: 1.134 ⋅ Sink Faucet
Lead Concentration in Water (from RTI International)
Value |
Analysis Date |
0.29 ppb | March 7, 2024 |
-
1.134aB
Location: Classroom: 1.134 ⋅ Sink Bubbler
Lead Concentration in Water (from RTI International)
Value |
Analysis Date |
0.46 ppb | March 6, 2024 |
-
1.135a
Location: Classroom: 1.135 ⋅ Sink Faucet
Lead Concentration in Water (from RTI International)
Value |
Analysis Date |
28.89 ppb | March 6, 2024 |
Followup Lead Concentration in Water (from RTI International)
Value |
Sample Type |
Analysis Date |
217.14 ppb The reported value is from a dilution | First Draw | April 19, 2024 |
0.36 ppb | 30-second Flush | April 17, 2024 |
Lead Concentration in Water (from RTI International)
Value |
Analysis Date |
6.64 ppb | August 11, 2024 |
Remediation Actions - recorded May 13, 2024
Low-Cost Risk Mitigation Measures
Replaced faucet fixtures
Additional Risk Mitigation Measures
Replaced other plumbing components
-
1.135aB
Location: Classroom: 1.135 ⋅ Sink Bubbler
Lead Concentration in Water (from RTI International)
Value |
Analysis Date |
0.77 ppb | March 6, 2024 |
-
1.145a
Location: Classroom: 1.145 ⋅ Sink Faucet
Lead Concentration in Water (from RTI International)
Value |
Analysis Date |
< 0.10 ppb | March 6, 2024 |
-
1.145aB
Location: Classroom: 1.145 ⋅ Sink Bubbler
Lead Concentration in Water (from RTI International)
Value |
Analysis Date |
0.13 ppb | March 6, 2024 |
-
1.150a
Location: Classroom: 1.150 ⋅ Sink Faucet
Lead Concentration in Water (from RTI International)
Value |
Analysis Date |
< 0.10 ppb | March 6, 2024 |
-
1.150aB
Location: Classroom: 1.150 ⋅ Sink Bubbler
Lead Concentration in Water (from RTI International)
Value |
Analysis Date |
0.17 ppb | March 6, 2024 |
-
1.169a
Location: Classroom: 1.169 ⋅ Sink Faucet
Lead Concentration in Water (from RTI International)
Value |
Analysis Date |
0.26 ppb | March 6, 2024 |
-
1.169aB
Location: Classroom: 1.169 ⋅ Sink bubbler
Lead Concentration in Water (from RTI International)
Value |
Analysis Date |
0.19 ppb | March 6, 2024 |
-
1.170a
Location: Classroom: 1.170 ⋅ Sink Faucet
Lead Concentration in Water (from RTI International)
Value |
Analysis Date |
< 0.10 ppb | March 7, 2024 |
-
1.170aB
Location: Classroom: 1.170 ⋅ Sink Bubbler
Lead Concentration in Water (from RTI International)
Value |
Analysis Date |
< 0.10 ppb | March 7, 2024 |
-
1.171a
Location: Classroom: 1.171 ⋅ Sink Faucet
Lead Concentration in Water (from RTI International)
Value |
Analysis Date |
0.31 ppb | March 7, 2024 |
-
1.171aB
Location: Classroom: 1.171 ⋅ Sink Bubbler
Lead Concentration in Water (from RTI International)
Value |
Analysis Date |
0.18 ppb | March 7, 2024 |
-
1.172a
Location: Classroom: 1.172 ⋅ Sink Faucet
Lead Concentration in Water (from RTI International)
Value |
Analysis Date |
0.19 ppb | March 7, 2024 |
-
1.172aB
Location: Classroom: 1.172 ⋅ Sink Bubbler
Lead Concentration in Water (from RTI International)
Value |
Analysis Date |
0.12 ppb | March 7, 2024 |
-
1.173a
Location: Classroom: 1.173 ⋅ Sink Faucet
Lead Concentration in Water (from RTI International)
Value |
Analysis Date |
0.43 ppb | March 7, 2024 |
-
1.173aB
Location: Classroom: 1.173 ⋅ Sink Bubbler
Lead Concentration in Water (from RTI International)
Value |
Analysis Date |
0.27 ppb | March 8, 2024 |
-
1.174a
Location: Classroom: 1.174 ⋅ Sink Faucet
Lead Concentration in Water (from RTI International)
Value |
Analysis Date |
0.33 ppb | March 8, 2024 |
-
1.174aB
Location: Classroom: 1.174 ⋅ Sink Bubbler
Lead Concentration in Water (from RTI International)
Value |
Analysis Date |
0.23 ppb | March 8, 2024 |
-
2.101a
Location: Classroom: 2.101 ⋅ Sink Bubbler
Lead Concentration in Water (from RTI International)
Value |
Analysis Date |
0.22 ppb | March 7, 2024 |
-
2.101aB
Location: Classroom: 2.101 ⋅ Sink Faucet
Lead Concentration in Water (from RTI International)
Value |
Analysis Date |
0.12 ppb | March 7, 2024 |
-
2.102a
Location: Classroom: 2.102 ⋅ Sink Faucet
Lead Concentration in Water (from RTI International)
Value |
Analysis Date |
0.20 ppb | March 7, 2024 |
-
2.102aB
Location: Classroom: 2.102 ⋅ Sink Bubbler
Lead Concentration in Water (from RTI International)
Value |
Analysis Date |
8.17 ppb | March 7, 2024 |
Remediation Actions - recorded October 3, 2024
Low-Cost Risk Mitigation Measures
Removed faucet fixtures
-
2.103a
Location: Classroom: 2.103 ⋅ Sink Faucet
Lead Concentration in Water (from RTI International)
Value |
Analysis Date |
0.28 ppb | March 7, 2024 |
-
2.103aB
Location: Classroom: 2.103 ⋅ Sink Bubbler
Lead Concentration in Water (from RTI International)
Value |
Analysis Date |
1.92 ppb | March 7, 2024 |
-
2.104a
Location: Classroom: 2.104 ⋅ Sink Faucet
Lead Concentration in Water (from RTI International)
Value |
Analysis Date |
0.20 ppb | March 7, 2024 |
-
2.104aB
Location: Classroom: 2.104 ⋅ Sink Bubbler
Lead Concentration in Water (from RTI International)
Value |
Analysis Date |
4.56 ppb | March 7, 2024 |
-
2.105a
Location: Classroom: 2.105 ⋅ Sink Faucet
Lead Concentration in Water (from RTI International)
Value |
Analysis Date |
0.17 ppb | March 7, 2024 |
-
2.105aB
Location: Classroom: 2.105 ⋅ Sink Bubbler
Lead Concentration in Water (from RTI International)
Value |
Analysis Date |
< 0.10 ppb | March 7, 2024 |
-
2.106a
Location: Classroom: 2.106 ⋅ Sink Faucet
Lead Concentration in Water (from RTI International)
Value |
Analysis Date |
0.98 ppb | March 7, 2024 |
-
2.106aB
Location: Classroom: 2.106 ⋅ Sink Bubbler
Lead Concentration in Water (from RTI International)
Value |
Analysis Date |
86.80 ppb | March 7, 2024 |
Followup Lead Concentration in Water (from RTI International)
Value |
Sample Type |
Analysis Date |
Facility indicated water outlet removed |
Facility indicated water outlet removed |
Remediation Actions - recorded March 25, 2024
Low-Cost Risk Mitigation Measures
Removed faucet fixtures
-
3.116a
Location: Classroom: 3.116 ⋅ Sink Faucet
Lead Concentration in Water (from RTI International)
Value |
Analysis Date |
0.56 ppb | March 7, 2024 |
-
3.116aB
Location: Classroom: 3.116 ⋅ Sink Bubbler
Lead Concentration in Water (from RTI International)
Value |
Analysis Date |
0.22 ppb | March 7, 2024 |
-
3.117a
Location: Classroom: 3.117 ⋅ Sink Faucet
Lead Concentration in Water (from RTI International)
Value |
Analysis Date |
0.38 ppb | March 7, 2024 |
-
3.117aB
Location: Classroom: 3.117 ⋅ Sink Bubbler
Lead Concentration in Water (from RTI International)
Value |
Analysis Date |
0.68 ppb | March 7, 2024 |
-
3.118a
Location: Classroom: 3.118 ⋅ Sink Faucet
Lead Concentration in Water (from RTI International)
Value |
Analysis Date |
0.18 ppb | March 5, 2024 |
-
3.118aB
Location: Classroom: 3.118 ⋅ Sink Bubbler
Lead Concentration in Water (from RTI International)
Value |
Analysis Date |
0.21 ppb | March 7, 2024 |
-
3.119a
Location: Classroom: 3.119 ⋅ Sink Faucet
Lead Concentration in Water (from RTI International)
Value |
Analysis Date |
0.55 ppb | March 5, 2024 |
-
3.119aB
Location: Classroom: 3.119 ⋅ Sink Bubbler
Lead Concentration in Water (from RTI International)
Value |
Analysis Date |
0.23 ppb | March 5, 2024 |
-
3.120a
Location: Classroom: 3.120 ⋅ Sink Faucet
Lead Concentration in Water (from RTI International)
Value |
Analysis Date |
0.46 ppb | March 5, 2024 |
-
3.120aB
Location: Classroom: 3.120 ⋅ Sink Bubbler
Lead Concentration in Water (from RTI International)
Value |
Analysis Date |
0.23 ppb | March 5, 2024 |
-
3.121a
Location: Classroom: 3.121 ⋅ Sink Faucet
Lead Concentration in Water (from RTI International)
Value |
Analysis Date |
0.32 ppb | March 5, 2024 |
-
3.121aB
Location: Classroom: 3.121 ⋅ Sink Bubbler
Lead Concentration in Water (from RTI International)
Value |
Analysis Date |
0.71 ppb | March 5, 2024 |
-
3.122a
Location: Classroom: 3.122 ⋅ Sink Faucet
Lead Concentration in Water (from RTI International)
Value |
Analysis Date |
0.24 ppb | March 5, 2024 |
-
3.122aB
Location: Classroom: 3.122 ⋅ Sink Bubbler
Lead Concentration in Water (from RTI International)
Value |
Analysis Date |
0.15 ppb | March 5, 2024 |
-
3.123a
Location: Classroom: 3.123 ⋅ Sink Faucet
Lead Concentration in Water (from RTI International)
Value |
Analysis Date |
0.54 ppb | March 5, 2024 |
-
3.123aB
Location: Classroom: 3.123 ⋅ Sink Bubbler
Lead Concentration in Water (from RTI International)
Value |
Analysis Date |
34.66 ppb | March 5, 2024 |
Followup Lead Concentration in Water (from RTI International)
Value |
Sample Type |
Analysis Date |
Facility indicated water outlet removed |
Facility indicated water outlet removed |
Remediation Actions - recorded March 25, 2024
Low-Cost Risk Mitigation Measures
Removed faucet fixtures
-
4.116a
Location: Classroom: 4.116 ⋅ Sink Faucet
Lead Concentration in Water (from RTI International)
Value |
Analysis Date |
1.04 ppb | March 13, 2024 |
-
4.123a
Location: Classroom: 4.123 ⋅ Sink Faucet
Lead Concentration in Water (from RTI International)
Value |
Analysis Date |
0.21 ppb | March 5, 2024 |
-
4.124a
Location: Classroom: 4.124 ⋅ Sink Faucet
Lead Concentration in Water (from RTI International)
Value |
Analysis Date |
0.15 ppb | March 5, 2024 |
-
4.125a
Location: Classroom: 4.125 ⋅ Sink Faucet
Lead Concentration in Water (from RTI International)
Value |
Analysis Date |
0.21 ppb | March 5, 2024 |
-
4.126a
Location: Classroom: 4.126 ⋅ Sink Faucet
Lead Concentration in Water (from RTI International)
Value |
Analysis Date |
0.71 ppb | March 5, 2024 |
-
4.135a
Location: Classroom: 4.135 ⋅ Sink Faucet
Lead Concentration in Water (from RTI International)
Value |
Analysis Date |
0.27 ppb | March 5, 2024 |
-
4.136a
Location: Classroom: 4.136 ⋅ Sink Faucet
Lead Concentration in Water (from RTI International)
Value |
Analysis Date |
0.20 ppb | March 5, 2024 |
-
4.137a
Location: Classroom: 4.137 ⋅ Sink Faucet
Lead Concentration in Water (from RTI International)
Value |
Analysis Date |
0.44 ppb | March 7, 2024 |
-
4.139a
Location: Classroom: 4.139 ⋅ Sink Faucet
Lead Concentration in Water (from RTI International)
Value |
Analysis Date |
1.24 ppb | March 7, 2024 |
-
4.147a
Location: Classroom: 4.147 ⋅ Sink Faucet
Lead Concentration in Water (from RTI International)
Value |
Analysis Date |
1.47 ppb | March 7, 2024 |
-
4.148a
Location: Classroom: 4.148 ⋅ Sink Faucet
Lead Concentration in Water (from RTI International)
Value |
Analysis Date |
0.97 ppb | March 7, 2024 |
-
4.149a
Location: Classroom: 4.149 ⋅ Sink Faucet
Lead Concentration in Water (from RTI International)
Value |
Analysis Date |
4.59 ppb | March 7, 2024 |
-
4.208a
Location: Classroom: 4.208 ⋅ Sink Faucet
Lead Concentration in Water (from RTI International)
Value |
Analysis Date |
0.22 ppb | March 7, 2024 |
-
4.208b
Location: Classroom: 4.208 ⋅ Sink Faucet
Lead Concentration in Water (from RTI International)
Value |
Analysis Date |
< 0.10 ppb | March 7, 2024 |
-
4.216a
Location: Classroom: 4.216 ⋅ Sink Faucet
Lead Concentration in Water (from RTI International)
Value |
Analysis Date |
< 0.10 ppb | March 7, 2024 |
-
4.223a
Location: Classroom: 4.223 ⋅ Sink Faucet
Lead Concentration in Water (from RTI International)
Value |
Analysis Date |
< 0.10 ppb | March 7, 2024 |
-
4.223b
Location: Classroom: 4.223 ⋅ Sink Faucet
Lead Concentration in Water (from RTI International)
Value |
Analysis Date |
< 0.10 ppb | March 7, 2024 |
-
4.225a
Location: Classroom: 4.225 ⋅ Sink Faucet
Lead Concentration in Water (from RTI International)
Value |
Analysis Date |
0.17 ppb | March 7, 2024 |
-
4.227a
Location: Classroom: 4.227 ⋅ Sink Faucet
Lead Concentration in Water (from RTI International)
Value |
Analysis Date |
0.12 ppb | March 7, 2024 |
-
4.229a
Location: Classroom: 4.229 ⋅ Sink Faucet
Lead Concentration in Water (from RTI International)
Value |
Analysis Date |
0.11 ppb | March 7, 2024 |
-
4.232a
Location: Classroom: 4.232 ⋅ Sink Faucet
Lead Concentration in Water (from RTI International)
Value |
Analysis Date |
0.14 ppb | March 7, 2024 |
-
4.236a
Location: Classroom: 4.236 ⋅ Sink Faucet
Lead Concentration in Water (from RTI International)
Value |
Analysis Date |
0.12 ppb | March 7, 2024 |
-
4.238a
Location: Classroom: 4.238 ⋅ Sink Faucet
Lead Concentration in Water (from RTI International)
Value |
Analysis Date |
0.18 ppb | March 7, 2024 |
-
4.242a
Location: Classroom: 4.242 ⋅ Sink Faucet
Lead Concentration in Water (from RTI International)
Value |
Analysis Date |
0.37 ppb | March 7, 2024 |
-
4.244a
Location: Classroom: 4.244 ⋅ Sink Faucet
Lead Concentration in Water (from RTI International)
Value |
Analysis Date |
0.13 ppb | March 7, 2024 |
-
4.254a
Location: Classroom: 4.254 ⋅ Sink Faucet
Lead Concentration in Water (from RTI International)
Value |
Analysis Date |
0.18 ppb | March 6, 2024 |
-
4.256a
Location: Classroom: 4.256 ⋅ Sink Faucet
Lead Concentration in Water (from RTI International)
Value |
Analysis Date |
0.11 ppb | March 6, 2024 |
-
4.306a
Location: Classroom: 4.306 ⋅ Sink Faucet
Lead Concentration in Water (from RTI International)
Value |
Analysis Date |
< 0.10 ppb | March 6, 2024 |
-
4.309a
Location: Classroom: 4.309 ⋅ Sink Faucet
Lead Concentration in Water (from RTI International)
Value |
Analysis Date |
0.34 ppb | March 6, 2024 |
-
4.316a
Location: Classroom: 4.316 ⋅ Sink Faucet
Lead Concentration in Water (from RTI International)
Value |
Analysis Date |
< 0.10 ppb | March 6, 2024 |
-
4.322a
Location: Classroom: 4.322 ⋅ Sink Faucet
Lead Concentration in Water (from RTI International)
Value |
Analysis Date |
0.31 ppb | March 6, 2024 |
-
4.324a
Location: Classroom: 4.324 ⋅ Sink Faucet
Lead Concentration in Water (from RTI International)
Value |
Analysis Date |
0.28 ppb | March 6, 2024 |
-
4.325a
Location: Classroom: 4.325 ⋅ Sink Faucet
Lead Concentration in Water (from RTI International)
Value |
Analysis Date |
0.17 ppb | March 6, 2024 |
-
4.326a
Location: Classroom: 4.326 ⋅ Sink Faucet
Lead Concentration in Water (from RTI International)
Value |
Analysis Date |
0.38 ppb | March 6, 2024 |
-
4.327a
Location: Classroom: 4.327 ⋅ Sink Faucet
Lead Concentration in Water (from RTI International)
Value |
Analysis Date |
0.62 ppb | March 6, 2024 |
-
4.328a
Location: Classroom: 4.328 ⋅ Sink Faucet
Lead Concentration in Water (from RTI International)
Value |
Analysis Date |
0.22 ppb | March 6, 2024 |
-
4.335a
Location: Classroom: 4.335 ⋅ Sink Faucet
Lead Concentration in Water (from RTI International)
Value |
Analysis Date |
0.12 ppb | March 6, 2024 |
-
4.336a
Location: Classroom: 4.336 ⋅ Sink Faucet
Lead Concentration in Water (from RTI International)
Value |
Analysis Date |
0.12 ppb | March 6, 2024 |
-
4.337a
Location: Classroom: 4.337 ⋅ Sink Faucet
Lead Concentration in Water (from RTI International)
Value |
Analysis Date |
0.39 ppb | March 6, 2024 |
-
4.339a
Location: Classroom: 4.339 ⋅ Sink Faucet
Lead Concentration in Water (from RTI International)
Value |
Analysis Date |
0.22 ppb | March 6, 2024 |
-
4.341a
Location: Classroom: 4.341 ⋅ Sink Faucet
Lead Concentration in Water (from RTI International)
Value |
Analysis Date |
0.16 ppb | March 6, 2024 |
-
4.352a
Location: Classroom: 4.352 ⋅ Sink Faucet
Lead Concentration in Water (from RTI International)
Value |
Analysis Date |
0.15 ppb | March 6, 2024 |
-
4.353a
Location: Classroom: 4.353 ⋅ Sink Faucet
Lead Concentration in Water (from RTI International)
Value |
Analysis Date |
0.20 ppb | March 6, 2024 |
-
4.354a
Location: Classroom: 4.354 ⋅ Sink Faucet
Lead Concentration in Water (from RTI International)
Value |
Analysis Date |
0.34 ppb | March 5, 2024 |
-
4.355a
Location: Classroom: 4.355 ⋅ Sink Faucet
Lead Concentration in Water (from RTI International)
Value |
Analysis Date |
0.13 ppb | March 5, 2024 |
-
4.356a
Location: Classroom: 4.356 ⋅ Sink Faucet
Lead Concentration in Water (from RTI International)
Value |
Analysis Date |
0.34 ppb | March 5, 2024 |
-
4.357a
Location: Classroom: 4.357 ⋅ Sink Faucet
Lead Concentration in Water (from RTI International)
Value |
Analysis Date |
< 0.10 ppb | March 5, 2024 |
-
4.358a
Location: Classroom: 4.358 ⋅ Sink Faucet
Lead Concentration in Water (from RTI International)
Value |
Analysis Date |
0.21 ppb | March 5, 2024 |
-
4.359a
Location: Classroom: 4.359 ⋅ Sink Faucet
Lead Concentration in Water (from RTI International)
Value |
Analysis Date |
0.10 ppb | March 5, 2024 |
-
4.360a
Location: Classroom: 4.360 ⋅ Sink Faucet
Lead Concentration in Water (from RTI International)
Value |
Analysis Date |
< 0.10 ppb | March 5, 2024 |
-
1.155a
Location: Kitchen/Cafeteria ⋅ 1.155
Lead Concentration in Water (from RTI International)
Value |
Analysis Date |
0.60 ppb | March 5, 2024 |
-
1.155b
Location: Kitchen/Cafeteria ⋅ 1.155
Lead Concentration in Water (from RTI International)
Value |
Analysis Date |
0.24 ppb | March 5, 2024 |
-
1.155c
Location: Kitchen/Cafeteria ⋅ 1.155
Lead Concentration in Water (from RTI International)
Value |
Analysis Date |
0.88 ppb | March 5, 2024 |
-
1.155d
Location: Kitchen/Cafeteria ⋅ 1.155
Lead Concentration in Water (from RTI International)
Value |
Analysis Date |
0.26 ppb | March 5, 2024 |
-
1.125WFa
Location: Water Fountains ⋅ 1.193
Lead Concentration in Water (from RTI International)
Value |
Analysis Date |
0.42 ppb | March 5, 2024 |
-
2.113WFa
Location: Water Fountains ⋅ 2.114
Lead Concentration in Water (from RTI International)
Value |
Analysis Date |
1.33 ppb | March 7, 2024 |
-
2.113WFb
Location: Water Fountains ⋅ 2.114
Lead Concentration in Water (from RTI International)
Value |
Analysis Date |
0.32 ppb | March 13, 2024 |
-
1.152WFa
Location: Water Fountains ⋅ 1.198
Lead Concentration in Water (from RTI International)
Value |
Analysis Date |
1.25 ppb | March 13, 2024 |
-
1.138WFb
Location: Water Fountains ⋅ 1.195
Lead Concentration in Water (from RTI International)
Value |
Analysis Date |
< 0.10 ppb | March 13, 2024 |
-
3.112WFa
Location: Water Fountains ⋅ 3.105
Lead Concentration in Water (from RTI International)
Value |
Analysis Date |
< 0.10 ppb | March 13, 2024 |
-
3.112WFb
Location: Water Fountains ⋅ 3.105
Lead Concentration in Water (from RTI International)
Value |
Analysis Date |
< 0.10 ppb | March 13, 2024 |
-
4.138WFa
Location: Water Fountains ⋅ 4.130
Lead Concentration in Water (from RTI International)
Value |
Analysis Date |
0.32 ppb | March 7, 2024 |
-
4.138WFb
Location: Water Fountains ⋅ 4.130
Lead Concentration in Water (from RTI International)
Value |
Analysis Date |
< 0.10 ppb | March 7, 2024 |
-
4.138WFc
Location: Water Fountains ⋅ 4.130
Lead Concentration in Water (from RTI International)
Value |
Analysis Date |
55.03 ppb | March 7, 2024 |
Followup Lead Concentration in Water (from RTI International)
Value |
Sample Type |
Analysis Date |
6.05 ppb | First Draw | April 17, 2024 |
0.17 ppb | 30-second Flush | April 17, 2024 |
Remediation Actions - recorded March 25, 2024
Low-Cost Risk Mitigation Measures
Replaced water fountains and/or water coolers
-
4.119WFa
Location: Water Fountains ⋅ 4.120
Lead Concentration in Water (from RTI International)
Value |
Analysis Date |
< 0.10 ppb | March 7, 2024 |
-
4.119WFb
Location: Water Fountains ⋅ 4.120
Lead Concentration in Water (from RTI International)
Value |
Analysis Date |
0.23 ppb | March 7, 2024 |
-
4.119WFc
Location: Water Fountains ⋅ 4.120
Lead Concentration in Water (from RTI International)
Value |
Analysis Date |
< 0.10 ppb | March 7, 2024 |
-
4.349WFa
Location: Water Fountains ⋅ 4.340
Lead Concentration in Water (from RTI International)
Value |
Analysis Date |
88.36 ppb | March 13, 2024 |
Followup Lead Concentration in Water (from RTI International)
Value |
Sample Type |
Analysis Date |
49.77 ppb | First Draw | April 19, 2024 |
0.25 ppb | 30-second Flush | April 17, 2024 |
Lead Concentration in Water (from RTI International)
Value |
Analysis Date |
1.47 ppb | September 25, 2024 |
Remediation Actions - recorded May 13, 2024
Low-Cost Risk Mitigation Measures
Replaced faucet fixtures
Additional Risk Mitigation Measures
Replaced other plumbing components
-
4.349WFb
Location: Water Fountains ⋅ 4.340
Lead Concentration in Water (from RTI International)
Value |
Analysis Date |
< 0.10 ppb | March 7, 2024 |
-
4.349WFc
Location: Water Fountains ⋅ 4.340
Lead Concentration in Water (from RTI International)
Value |
Analysis Date |
< 0.10 ppb | March 7, 2024 |
-
4.319WFa
Location: Water Fountains ⋅ 4.320
Lead Concentration in Water (from RTI International)
Value |
Analysis Date |
0.29 ppb | March 7, 2024 |
-
4.319BFb
Location: Water Fountains ⋅ 4.320
Lead Concentration in Water (from RTI International)
Value |
Analysis Date |
< 0.10 ppb | March 7, 2024 |
-
4.319WFc
Location: Water Fountains ⋅ 4.320
Lead Concentration in Water (from RTI International)
Value |
Analysis Date |
< 0.10 ppb | March 7, 2024 |
-
1.129
Location: Water Fountains ⋅ 1.193
Lead Concentration in Water (from RTI International)
Value |
Analysis Date |
13.30 ppb | March 7, 2024 |
Lead Concentration in Water (from RTI International)
Value |
Analysis Date |
1.74 ppb | November 14, 2024 |
-
4.311WFb
Location: Water Fountains ⋅ 4.310
Lead Concentration in Water (from RTI International)
Value |
Analysis Date |
< 0.10 ppb | March 7, 2024 |
-
4.211WFa
Location: Water Fountains ⋅ 4.210
Lead Concentration in Water (from RTI International)
Value |
Analysis Date |
0.21 ppb | March 7, 2024 |
-
4.211WFb
Location: Water Fountains ⋅ 4.210
Lead Concentration in Water (from RTI International)
Value |
Analysis Date |
< 0.10 ppb | March 7, 2024 |
-
4.219WFa
Location: Water Fountains ⋅ 4.220
Lead Concentration in Water (from RTI International)
Value |
Analysis Date |
< 0.10 ppb | March 7, 2024 |
-
4.219BFb
Location: Water Fountains ⋅ 4.220
Lead Concentration in Water (from RTI International)
Value |
Analysis Date |
< 0.10 ppb | March 7, 2024 |
-
4.219WFc
Location: Water Fountains ⋅ 4.220
Lead Concentration in Water (from RTI International)
Value |
Analysis Date |
0.10 ppb | March 7, 2024 |
-
4.251WFa
Location: Water Fountains ⋅ 4.240
Lead Concentration in Water (from RTI International)
Value |
Analysis Date |
< 0.10 ppb | March 7, 2024 |
-
4.251WFb
Location: Water Fountains ⋅ 4.240
Lead Concentration in Water (from RTI International)
Value |
Analysis Date |
< 0.10 ppb | March 7, 2024 |
-
4.251WFc
Location: Water Fountains ⋅ 4.240
Lead Concentration in Water (from RTI International)
Value |
Analysis Date |
< 0.10 ppb | March 7, 2024 |
-
1.169WFa
Location: Water Fountains ⋅ 1.196
Lead Concentration in Water (from RTI International)
Value |
Analysis Date |
< 0.10 ppb | March 7, 2024 |
-
1.174WFa
Location: Water Fountains ⋅ 1.196
Lead Concentration in Water (from RTI International)
Value |
Analysis Date |
< 0.10 ppb | March 7, 2024 |
-
1.138WFa
Location: Water Fountains ⋅ 1.195
Lead Concentration in Water (from RTI International)
Value |
Analysis Date |
0.14 ppb | March 7, 2024 |
-
1.180BF
Location: Water Fountains ⋅ 1.197
Lead Concentration in Water (from RTI International)
Value |
Analysis Date |
0.82 ppb | March 7, 2024 |
-
1.180BFb
Location: Water Fountains ⋅ 1.197
Lead Concentration in Water (from RTI International)
Value |
Analysis Date |
1.62 ppb | March 5, 2024 |