Mason Elementary Facility

53 Gwinnett Drive, Bldg E, Lawrenceville, GA 30046


About this Page

On this page you will be able to see results from this facility by tap as available. To help you understand these results, you can watch this video or read "Understanding the Results of Your Water Test" on pages 7-9 of our Full Program Instructions.

The Lead Concentration in Water shows the result from the sample the center collected. ppb means parts per billion, and is a way of explaining the amount of lead in water.

Centers and schools are able to post mitigation actions for each tap here following these instructions.


Taps and Results
  • 1.105a
    Location: Classroom: 1.105 ⋅ Sink Faucet
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    1.56 ppbApril 13, 2024
  • 1.106a
    Location: Classroom: 1.106 ⋅ Sink Faucet
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    < 0.10 ppbApril 13, 2024
  • 1.109a
    Location: Classroom: 1.109 ⋅ Sink Faucet
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    < 0.10 ppbApril 13, 2024
  • 1.109aB
    Location: Classroom: 1.109 ⋅ Sink Bubbler
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    4.06 ppbApril 13, 2024
  • 1.111a
    Location: Classroom: 1.111 ⋅ Sink Faucet
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    2.22 ppbApril 13, 2024
  • 1.117a
    Location: Classroom: 1.117 ⋅ Sink Faucet
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    < 0.10 ppbApril 13, 2024
  • 1.117aB
    Location: Classroom: 1.117 ⋅ Sink Bubbler
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    18.56 ppbApril 13, 2024
    Followup Lead Concentration in Water (from RTI International)
    Value Sample Type Analysis Date
    Facility indicated water outlet removed
    Facility indicated water outlet removed
    Remediation Actions - recorded April 30, 2024
    Low-Cost Risk Mitigation Measures
    Removed faucet fixtures
  • 1.121a
    Location: Classroom: 1.121 ⋅ Sink Faucet
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    44.35 ppbApril 13, 2024
    Followup Lead Concentration in Water (from RTI International)
    Value Sample Type Analysis Date
    0.67 ppbFirst DrawJune 7, 2024
    0.12 ppb30-second FlushJune 7, 2024
    Remediation Actions - recorded April 30, 2024
    Low-Cost Risk Mitigation Measures
    Replaced faucet fixtures
  • 1.121aB
    Location: Classroom: 1.121 ⋅ Sink Bubbler
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    2.40 ppbApril 13, 2024
  • 1.122a
    Location: Classroom: 1.122 ⋅ Sink Faucet
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    0.26 ppbApril 13, 2024
  • 1.122aB
    Location: Classroom: 1.122 ⋅ Sink Bubbler
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    7.38 ppbApril 13, 2024
  • 1.123a
    Location: Classroom: 1.123 ⋅ Sink Faucet
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    3.44 ppbApril 13, 2024
  • 1.123aB
    Location: Classroom: 1.123 ⋅ Sink Bubbler
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    27.73 ppbApril 19, 2024
    Followup Lead Concentration in Water (from RTI International)
    Value Sample Type Analysis Date
    Facility indicated water outlet removed
    Facility indicated water outlet removed
    Remediation Actions - recorded April 30, 2024
    Low-Cost Risk Mitigation Measures
    Removed faucet fixtures
  • 1.126a
    Location: Classroom: 1.126 ⋅ Sink Faucet
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    10.43 ppbApril 13, 2024
  • 1.126aB
    Location: Classroom: 1.126 ⋅ Sink Bubbler
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    0.13 ppbApril 13, 2024
  • 1.128a
    Location: Classroom: 1.128 ⋅ Sink Faucet
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    0.10 ppbApril 13, 2024
  • 1.128aB
    Location: Classroom: 1.128 ⋅ Sink Bubbler
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    15.14 ppbApril 14, 2024
    Followup Lead Concentration in Water (from RTI International)
    Value Sample Type Analysis Date
    Facility indicated water outlet removed
    Facility indicated water outlet removed
    Remediation Actions - recorded April 30, 2024
    Low-Cost Risk Mitigation Measures
    Removed faucet fixtures
  • 1.132a
    Location: Classroom: 1.132 ⋅ Sink Faucet
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    < 0.10 ppbApril 1, 2024
  • 1.132aB
    Location: Classroom: 1.132 ⋅ Sink Bubbler
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    12.36 ppbApril 19, 2024
    Remediation Actions - recorded October 3, 2024
    Low-Cost Risk Mitigation Measures
    Removed faucet fixtures
  • 1.135a
    Location: Classroom: 1.135 ⋅ Sink Faucet
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    < 0.10 ppbApril 1, 2024
  • 1.135aB
    Location: Classroom: 1.135 ⋅ Sink Bubbler
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    1.17 ppbApril 1, 2024
  • 1.137a
    Location: Classroom: 1.137 ⋅ Sink Faucet
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    0.14 ppbApril 1, 2024
  • 1.137aB
    Location: Classroom: 1.137 ⋅ Sink Bubbler
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    2.49 ppbApril 1, 2024
  • 1.139a
    Location: Classroom: 1.139 ⋅ Sink Faucet
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    1.24 ppbApril 1, 2024
  • 1.139aB
    Location: Classroom: 1.139 ⋅ Sink Bubbler
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    2.54 ppbApril 1, 2024
  • 1.141a
    Location: Classroom: 1.141 ⋅ Sink Faucet
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    1.71 ppbApril 1, 2024
  • 1.141aB
    Location: Classroom: 1.141 ⋅ Sink Bubbler
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    5.98 ppbApril 1, 2024
  • 1.143a
    Location: Classroom: 1.143 ⋅ Sink Faucet
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    < 0.10 ppbApril 1, 2024
  • 1.143aB
    Location: Classroom: 1.143 ⋅ Sink Bubbler
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    0.86 ppbApril 1, 2024
  • 1.145a
    Location: Classroom: 1.145 ⋅ Sink Faucet
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    0.11 ppbApril 1, 2024
  • 1.145aB
    Location: Classroom: 1.145 ⋅ Sink Bubbler
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    1.11 ppbApril 1, 2024
  • 1.151a
    Location: Classroom: 1.151 ⋅ Sink Faucet
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    0.63 ppbApril 1, 2024
  • 1.157a
    Location: Classroom: 1.157 ⋅ Sink Faucet
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    3.65 ppbApril 1, 2024
  • 1.157aB
    Location: Classroom: 1.157 ⋅ Sink Bubbler
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    0.62 ppbApril 1, 2024
  • 1.159a
    Location: Classroom: 1.159 ⋅ Sink Faucet
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    < 0.10 ppbApril 1, 2024
  • 1.159aB
    Location: Classroom: 1.159 ⋅ Sink Bubbler
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    0.56 ppbApril 1, 2024
  • 1.161a
    Location: Classroom: 1.161 ⋅ Sink Faucet
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    0.69 ppbApril 13, 2024
  • 1.161aB
    Location: Classroom: 1.161 ⋅ Sink Bubbler
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    0.78 ppbApril 13, 2024
  • 1.163a
    Location: Classroom: 1.163 ⋅ Sink Faucet
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    0.23 ppbApril 13, 2024
  • 1.163aB
    Location: Classroom: 1.163 ⋅ Sink Bubbler
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    0.71 ppbApril 13, 2024
  • 1.165a
    Location: Classroom: 1.165 ⋅ Sink Faucet
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    < 0.10 ppbApril 13, 2024
  • 1.165aB
    Location: Classroom: 1.165 ⋅ Sink Bubbler
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    0.74 ppbApril 13, 2024
  • 1.167a
    Location: Classroom: 1.167 ⋅ Sink Faucet
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    < 0.10 ppbApril 13, 2024
  • 1.167aB
    Location: Classroom: 1.167 ⋅ Sink Bubbler
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    0.67 ppbApril 13, 2024
  • 1.169a
    Location: Classroom: 1.169 ⋅ Sink Faucet
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    2.87 ppbApril 13, 2024
  • 1.169aB
    Location: Classroom: 1.169 ⋅ Sink Bubbler
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    1.05 ppbApril 13, 2024
  • 1.173a
    Location: Classroom: 1.173 ⋅ Sink Faucet
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    < 0.10 ppbApril 13, 2024
  • 1.173aB
    Location: Classroom: 1.173 ⋅ Sink Bubbler
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    81.69 ppbApril 19, 2024
    Followup Lead Concentration in Water (from RTI International)
    Value Sample Type Analysis Date
    Facility indicated water outlet removed
    Facility indicated water outlet removed
    Remediation Actions - recorded April 30, 2024
    Low-Cost Risk Mitigation Measures
    Removed faucet fixtures
  • 1.177a
    Location: Classroom: 1.177 ⋅ Sink Faucet
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    < 0.10 ppbApril 13, 2024
  • 1.177aB
    Location: Classroom: 1.177 ⋅ Sink Bubbler
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    1.00 ppbApril 13, 2024
  • 1.179a
    Location: Classroom: 1.179 ⋅ Sink Faucet
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    0.31 ppbApril 13, 2024
  • 1.179aB
    Location: Classroom: 1.179 ⋅ Sink Bubbler
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    2.15 ppbApril 13, 2024
  • 1.181a
    Location: Classroom: 1.181 ⋅ Sink Faucet
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    3.66 ppbApril 13, 2024
  • 1.181aB
    Location: Classroom: 1.181 ⋅ Sink Bubbler
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    3.33 ppbApril 13, 2024
  • 1.183a
    Location: Classroom: 1.183 ⋅ Sink Faucet
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    0.13 ppbApril 13, 2024
  • 1.183aB
    Location: Classroom: 1.183 ⋅ Sink Bubbler
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    0.39 ppbApril 13, 2024
  • 1.184a
    Location: Classroom: 1.184 ⋅ Sink Faucet
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    1.89 ppbApril 13, 2024
  • 1.184aB
    Location: Classroom: 1.184 ⋅ Sink Bubbler
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    0.52 ppbApril 13, 2024
  • 1.186a
    Location: Classroom: 1.186 ⋅ Sink Faucet
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    1.06 ppbApril 13, 2024
  • 1.186aB
    Location: Classroom: 1.186 ⋅ Sink Bubbler
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    5.02 ppbApril 13, 2024
  • 1.196a
    Location: Classroom: 1.196 ⋅ Sink Faucet
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    1.35 ppbApril 13, 2024
  • 1.206a
    Location: Classroom: 1.206 ⋅ Sink Faucet
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    < 0.10 ppbApril 13, 2024
  • 1.206aB
    Location: Classroom: 1.206 ⋅ Sink Bubbler
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    0.41 ppbApril 13, 2024
  • 1.207a
    Location: Classroom: 1.207 ⋅ Sink Faucet
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    < 0.10 ppbApril 13, 2024
  • 1.207aB
    Location: Classroom: 1.207 ⋅ Sink Bubbler
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    0.42 ppbApril 13, 2024
  • 1.208a
    Location: Classroom: 1.208 ⋅ Sink Faucet
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    0.11 ppbApril 13, 2024
  • 1.208aB
    Location: Classroom: 1.208 ⋅ Sink Bubbler
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    0.60 ppbApril 13, 2024
  • 1.209a
    Location: Classroom: 1.209 ⋅ Sink Faucet
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    < 0.10 ppbApril 13, 2024
  • 1.209aB
    Location: Classroom: 1.209 ⋅ Sink Bubbler
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    0.13 ppbApril 13, 2024
  • 1.211a
    Location: Classroom: 1.211 ⋅ Sink Faucet
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    2.09 ppbApril 13, 2024
  • 1.211aB
    Location: Classroom: 1.211 ⋅ Sink Bubbler
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    0.44 ppbApril 13, 2024
  • 1.212a
    Location: Classroom: 1.212 ⋅ Sink Faucet
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    0.20 ppbApril 13, 2024
  • 1.212aB
    Location: Classroom: 1.212 ⋅ Sink Bubbler
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    0.42 ppbApril 13, 2024
  • 1.213a
    Location: Classroom: 1.213 ⋅ Sink Faucet
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    < 0.10 ppbApril 13, 2024
  • 1.213aB
    Location: Classroom: 1.213 ⋅ Sink Bubbler
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    0.25 ppbApril 13, 2024
  • 1.214a
    Location: Classroom: 1.214 ⋅ Sink Faucet
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    0.25 ppbApril 10, 2024
  • 1.214aB
    Location: Classroom: 1.214 ⋅ Sink Bubbler
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    11.33 ppbApril 10, 2024
    Remediation Actions - recorded October 3, 2024
    Low-Cost Risk Mitigation Measures
    Removed faucet fixtures
  • 1.216a
    Location: Classroom: 1.216 ⋅ Sink Faucet
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    0.69 ppbApril 10, 2024
  • 1.216aB
    Location: Classroom: 1.216 ⋅ Sink Bubbler
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    6.44 ppbApril 10, 2024
  • 1.217a
    Location: Classroom: 1.217 ⋅ Sink Faucet
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    < 0.10 ppbApril 10, 2024
  • 1.217aB
    Location: Classroom: 1.217 ⋅ Sink Bubbler
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    2.73 ppbApril 10, 2024
  • 1.218a
    Location: Classroom: 1.218 ⋅ Sink Faucet
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    0.51 ppbApril 14, 2024
  • 1.218aB
    Location: Classroom: 1.218 ⋅ Sink Bubbler
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    11.18 ppbApril 14, 2024
    Remediation Actions - recorded October 3, 2024
    Low-Cost Risk Mitigation Measures
    Removed faucet fixtures
  • 1.219a
    Location: Classroom: 1.219 ⋅ Sink Faucet
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    0.32 ppbApril 14, 2024
  • 1.219aB
    Location: Classroom: 1.219 ⋅ Sink Bubbler
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    0.18 ppbApril 14, 2024
  • 1.221a
    Location: Classroom: 1.221 ⋅ Sink Faucet
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    0.10 ppbApril 14, 2024
  • 1.221aB
    Location: Classroom: 1.221 ⋅ Sink Bubbler
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    0.59 ppbApril 10, 2024
  • 1.222a
    Location: Classroom: 1.222 ⋅ Sink Faucet
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    0.12 ppbApril 10, 2024
  • 1.222aB
    Location: Classroom: 1.222 ⋅ Sink Bubbler
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    < 0.10 ppbApril 13, 2024
  • 1.223a
    Location: Classroom: 1.223 ⋅ Sink Faucet
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    0.55 ppbApril 13, 2024
  • 1.223aB
    Location: Classroom: 1.223 ⋅ Sink Bubbler
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    2.76 ppbApril 13, 2024
  • 1.239a
    Location: Classroom: 1.239 ⋅ Sink Faucet
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    0.13 ppbApril 13, 2024
  • 1.239b
    Location: Classroom: 1.239 ⋅ Sink Faucet
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    < 0.10 ppbApril 13, 2024
  • 1.242a
    Location: Classroom: 1.242 ⋅ Sink Faucet
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    0.20 ppbApril 13, 2024
  • 1.242b
    Location: Classroom: 1.242 ⋅ Sink Faucet
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    0.45 ppbApril 13, 2024
  • 1.248a
    Location: Classroom: 1.248 ⋅ Sink Faucet
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    0.47 ppbApril 13, 2024
  • 1.258a
    Location: Classroom: 1.258 ⋅ Sink Faucet
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    0.19 ppbApril 13, 2024
  • 2.103a
    Location: Classroom: 2.103 ⋅ Sink Faucet
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    0.32 ppbApril 13, 2024
  • 2.116a
    Location: Classroom: 2.116 ⋅ Sink Faucet
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    0.14 ppbApril 13, 2024
  • 1.118a
    Location: Classroom: 2.118 ⋅ Sink Faucet
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    0.42 ppbApril 13, 2024
  • 2.120a
    Location: Classroom: 2.120 ⋅ Sink Faucet
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    < 0.10 ppbApril 13, 2024
  • 2.124a
    Location: Classroom: 2.124 ⋅ Sink Faucet
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    4.08 ppbApril 13, 2024
  • 2.127a
    Location: Classroom: 2.127 ⋅ Sink Faucet
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    0.79 ppbApril 13, 2024
  • 2.128a
    Location: Classroom: 2.128 ⋅ Sink Faucet
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    0.46 ppbApril 13, 2024
  • 2.129a
    Location: Classroom: 2.129 ⋅ Sink Faucet
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    0.14 ppbApril 13, 2024
  • 2.130a
    Location: Classroom: 2.130 ⋅ Sink Faucet
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    < 0.10 ppbApril 13, 2024
  • 2.131a
    Location: Classroom: 2.131 ⋅ Sink Faucet
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    0.26 ppbApril 13, 2024
  • 2.132a
    Location: Classroom: 2.132 ⋅ Sink Faucet
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    1.40 ppbApril 13, 2024
  • 2.133a
    Location: Classroom: 2.133 ⋅ Sink Faucet
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    1.50 ppbApril 13, 2024
  • 2.134a
    Location: Classroom: 2.134 ⋅ Sink Faucet
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    0.43 ppbApril 13, 2024
  • 2.138a
    Location: Classroom: 2.138 ⋅ Sink Faucet
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    0.21 ppbApril 13, 2024
  • 2.213a
    Location: Classroom: 2.213 ⋅ Sink Faucet
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    8.91 ppbApril 13, 2024
  • 2.214a
    Location: Classroom: 2.214 ⋅ Sink Faucet
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    3.44 ppbApril 13, 2024
  • 2.216a
    Location: Classroom: 2.216 ⋅ Sink Faucet
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    1.64 ppbApril 13, 2024
  • 2.217a
    Location: Classroom: 2.217 ⋅ Sink Faucet
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    3.61 ppbApril 13, 2024
  • 2.218a
    Location: Classroom: 2.218 ⋅ Sink Faucet
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    2.50 ppbApril 13, 2024
  • 2.219a
    Location: Classroom: 2.219 ⋅ Sink Faucet
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    2.77 ppbApril 13, 2024
  • 2.220a
    Location: Classroom: 2.220 ⋅ Sink Faucet
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    1.63 ppbApril 13, 2024
  • 2.222a
    Location: Classroom: 2.222 ⋅ Sink Faucet
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    0.49 ppbApril 13, 2024
  • 2.223a
    Location: Classroom: 2.223 ⋅ Sink Faucet
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    0.73 ppbApril 13, 2024
  • 2.224a
    Location: Classroom: 2.224 ⋅ Sink Faucet
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    2.88 ppbApril 13, 2024
  • 2.226a
    Location: Classroom: 2.226 ⋅ Sink Faucet
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    0.91 ppbApril 13, 2024
  • 2.228a
    Location: Classroom: 2.228 ⋅ Sink Faucet
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    1.17 ppbApril 13, 2024
  • 2.229a
    Location: Classroom: 2.229 ⋅ Sink Faucet
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    2.06 ppbApril 13, 2024
  • 2.231a
    Location: Classroom: 2.231 ⋅ Sink Faucet
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    1.68 ppbApril 13, 2024
  • 2.232a
    Location: Classroom: 2.232 ⋅ Sink Faucet
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    1.65 ppbApril 13, 2024
  • 1.228a
    Location: Kitchen/Cafeteria ⋅ 1.228
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    0.25 ppbApril 10, 2024
  • 1.228a
    Location: Kitchen/Cafeteria ⋅ 1.228
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    0.71 ppbApril 10, 2024
  • 1.224
    Location: Water Fountains ⋅ 1.240
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    < 0.10 ppbApril 10, 2024
  • 1.224
    Location: Water Fountains ⋅ 1.240
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    < 0.10 ppbApril 13, 2024
  • 1.224
    Location: Water Fountains ⋅ 1.240
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    < 0.10 ppbApril 10, 2024
  • 1.224a
    Location: Water Fountains ⋅ 1.224
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    < 0.10 ppbApril 10, 2024
  • 1.224b
    Location: Water Fountains ⋅ 1.224
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    < 0.10 ppbApril 13, 2024
  • 1.111
    Location: Water Fountains ⋅ 1.110
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    < 0.10 ppbApril 13, 2024
  • 1.111
    Location: Water Fountains ⋅ 1.110
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    < 0.10 ppbApril 13, 2024
  • 1.111
    Location: Water Fountains ⋅ 1.110
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    0.14 ppbApril 10, 2024
  • 1.149
    Location: Water Fountains ⋅ 1.130
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    < 0.10 ppbApril 13, 2024
  • 1.149
    Location: Water Fountains ⋅ 1.130
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    < 0.10 ppbApril 13, 2024
  • 1.149
    Location: Water Fountains ⋅ 1.130
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    < 0.10 ppbApril 13, 2024
  • 1.149
    Location: Water Fountains ⋅ 1.130
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    < 0.10 ppbApril 13, 2024
  • 1.189
    Location: Water Fountains ⋅ 1.180
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    < 0.10 ppbApril 13, 2024
  • 1.189
    Location: Water Fountains ⋅ 1.180
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    < 0.10 ppbApril 13, 2024
  • 1.189
    Location: Water Fountains ⋅ 1.180
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    < 0.10 ppbApril 13, 2024
  • 1.189
    Location: Water Fountains ⋅ 1.180
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    < 0.10 ppbApril 13, 2024
  • 2.221
    Location: Water Fountains ⋅ 2.230
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    < 0.10 ppbApril 13, 2024
  • 2.221
    Location: Water Fountains ⋅ 2.230
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    < 0.10 ppbApril 13, 2024
  • 2.207
    Location: Water Fountains ⋅ 2.210
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    < 0.10 ppbApril 13, 2024
  • 2.207
    Location: Water Fountains ⋅ 2.210
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    < 0.10 ppbApril 13, 2024
  • 2.207
    Location: Water Fountains ⋅ 2.210
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    < 0.10 ppbApril 13, 2024
  • 2.126
    Location: Water Fountains ⋅ 2.131
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    < 0.10 ppbApril 13, 2024
  • 2.126
    Location: Water Fountains ⋅ 2.131
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    < 0.10 ppbApril 13, 2024
  • 2.113
    Location: Water Fountains ⋅ 2.110
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    < 0.10 ppbApril 13, 2024
  • 2.113
    Location: Water Fountains ⋅ 2.110
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    < 0.10 ppbApril 13, 2024
  • 2.113
    Location: Water Fountains ⋅ 2.110
    Lead Concentration in Water (from RTI International)
    Value Analysis Date
    < 0.10 ppbApril 10, 2024